Risqure

Your risk register, free and ready in 10 minutes.

Describe your project. Risqure proposes the relevant risks, scores them on a 5×5 matrix and suggests prevention and protection measures. Your team then tracks everything in one place.

For project managers, HSE managers, maintenance managers and engineers. No credit card.

Example: renovation of an office buildingBefore and after actions
↑ ImpactProbability →
  • R-01Fall from the scaffoldingGuardrails, scaffold inspected before use 15 5
  • R-02Late delivery of materialsOrders placed early, buffer stock on site 12 6
  • R-03Ransomware on the site officeOffline backups, two-factor sign-in 12 4
  • R-04Dust complaints from neighboursWater spraying and dust screens 8 2
  • R-05Asbestos found during stripping outAsbestos survey before works, licensed contractor 10 4

Total exposure57 21−63 %

How it works

Three steps, about ten minutes for a first register.

  1. Describe your project

    Sector, activities, environment, people involved, organisation, IT: a short questionnaire in four steps.

  2. Review the proposed risks

    Risqure proposes 20 to 35 risks with cause, consequence, score and the reason they were proposed. You keep, edit or reject each one.

  3. Act and follow up

    Assign actions, review risks periodically, record incidents and follow the evolution of your exposure.

Everything you need to manage risks, at no cost

One register for the whole team, from the first analysis to the steering committee.

5×5 risk matrix
Gross and residual matrix, drag a risk to re-score it.
Bow-tie analysis
Causes, prevention barriers, consequences and protection barriers for each risk.
Action plan and Kanban
Owner, due date, progress and type of measure, from elimination to PPE; Kanban from “to do” to “done”.
Site opening and closing
Country checklists for Belgium and France, companies on site with their order references, and a report in PDF.
Field reports by QR code
Workers report a hazard or a near miss from their phone, with photos and without an account.
Incident log
Accidents, near misses and hazards linked to the risks, with victim, causes and legal declaration deadlines.
HSE indicators
Days without lost-time accident, frequency and severity rates, and overdue actions on the dashboard.
Regulatory documents and exports
Single risk assessment document (France), global prevention plan and annual action plan (Belgium), PDF and Excel exports.
Calendar synced with Outlook and Google
Due actions and risk reviews in your usual calendar.
Periodic risk reviews
Review frequency according to the level, with reminders to the owner.
Exposure trend
Daily curve of total and residual exposure for each project.
Teamwork
Roles, invitations, comments with mentions, alerts on critical risks, read-only link for a client.

Want your own logo on the documents and priority support? See the Pro plan

Ready-made examples by type of project

Start from a complete example and adapt it: free to download or to create online.

All risk register examples

Built for the fieldWorks on computers and phones, in seven languages.

Your data stays in EuropeHosted in France, GDPR compliant. Export or delete your data at any time.

Your own AI, if you wantConnect your Claude, ChatGPT, Gemini or Mistral account, or simply use the risk library.

Frequently asked questions

Is Risqure really free?

Yes. The free version is complete and has no time limit: projects, risks, actions, documents and your whole team, with no credit card. Risqure Pro is optional, for organisations that want their own logo on their documents and priority support.

What is a risk register?

It is the list of the risks of a project or an activity, each with its cause, consequence, probability, impact, owner and actions. It is the core document of risk management (ISO 31000, ISO 45001, PMBOK).

How does Risqure propose risks?

You answer a few questions about the project: sector, activities, environment, people, organisation and IT. Risqure selects the matching risks from its library, written by practitioners, and adjusts their score to your answers.

Which risk matrix does Risqure use?

A 5×5 matrix: probability from 1 (rare) to 5 (almost certain) and impact from 1 (negligible) to 5 (severe). The score goes from 1 to 25 and gives four levels: low, moderate, high and critical.

Can I export my register to Excel or PDF?

Yes, at any time, in PDF and in Excel-compatible CSV. You can also import an existing register from a CSV file.

Does Risqure follow Belgian and French regulations?

Yes. The prevention documents follow the Belgian code on well-being at work (global prevention plan, annual action plan) and the French labour code (single risk assessment document). The site checklists include the prior notice and coordination duties of each country.

What does Risqure Pro add?

Your organisation’s logo on the PDF documents instead of the Risqure mention, priority support by e-mail and an annual invoice with VAT, from 99 € excl. VAT per year. Every feature of the free version stays free.

Where is my data stored?

On a server in France, in compliance with the GDPR. You can export or delete your account and your data at any time.

Start your risk register now

Free, no credit card, ready in 10 minutes.

Create my register for free