5×5 risk score calculator (probability × impact)
Calculate a risk score on a 5×5 matrix for free: level, recommended review interval and the effect of your measures (residual risk).
Initial risk
Recommended review interval: days
After your measures (residual risk)
Your measures reduce the score by .
Prevention measures mostly lower the probability; protection measures mostly lower the impact.
The 5×5 matrix
| 1 Negligible | 2 Minor | 3 Moderate | 4 Major | 5 Very serious | |
|---|---|---|---|---|---|
| 5 Almost certain | 5 | 10 | 15 | 20 | 25 |
| 4 Likely | 4 | 8 | 12 | 16 | 20 |
| 3 Possible | 3 | 6 | 9 | 12 | 15 |
| 2 Unlikely | 2 | 4 | 6 | 8 | 10 |
| 1 Rare | 1 | 2 | 3 | 4 | 5 |
Probability vertically, impact horizontally. Levels: low 1–4, moderate 5–9, high 10–14, critical 15–25.
Describe your project: Risqure proposes the risks, scores them and suggests the measures. Free, no credit card.
5×5 risk matrix: how to use it, with an example →
How do you calculate a risk score?
A risk score is the product of two ratings from 1 to 5: the probability that the event happens and the severity of its consequences. A likely risk (4) with serious consequences (4) therefore scores 16 out of 25. To rate severity, use the most realistic consequence, not the worst imaginable scenario nor the most favourable case.
The four levels of the 5×5 matrix
From 1 to 4 the risk is low: keep the existing measures and review it about every six months. From 5 to 9 it is moderate: plan improvements and review it every three months. From 10 to 14 it is high: measures with an owner and a deadline are needed, with a review every two months. From 15 to 25 it is critical: act before the work starts or continues and review it every month.
Gross risk and residual risk
Gross risk is assessed before the new measures, residual risk after them. Enter in the calculator the probability and severity you expect once the measures are in place: the gap between the two scores shows how effective your action plan is. A collective measure, such as a guardrail, usually lowers the probability; personal protective equipment mostly limits the severity.
Frequently asked questions
What is the difference between severity and impact?
They are two words for the same rating: how large the consequences are if the risk occurs. Health and safety teams tend to say severity; project managers say impact (time, cost, quality, reputation).
Should I use a 5×5 or a 4×4 matrix?
The 5×5 matrix is the most common and separates intermediate situations better. What matters most is using the same scale across the organisation and defining each rating clearly.
Can a low risk be ignored?
No. A low risk stays in the register with its existing measures and is reviewed periodically: a change of method, team or site can push it up.
This information is general and does not replace advice adapted to your situation. Always check the official texts in force. Disclaimer