Risk management glossary

The essential terms explained simply.

5

5 whys
A technique that asks “why?” several times in a row to reach the root cause of a problem.

A

ATEX
Explosive atmosphere: a mixture of air with flammable gases, vapours, mists or dusts that can explode when ignited.

B

Barrier
A measure that prevents an unwanted event (prevention barrier) or limits its consequences (protection barrier).
Bow-tie
A view of a risk with its causes and prevention barriers on the left and its consequences and protection barriers on the right.
Business continuity plan
The arrangements to keep or restore essential activities after a disaster.

C

Cause
What can make a risk happen. A single risk often has several causes.
Cause tree
An accident analysis method that traces, fact by fact, the chain of causes that led to the event.
Confined space
A fully or partly enclosed space, not designed for continuous work, where the atmosphere can become dangerous.
Consequence
The effect of an event on objectives: injury, delay, extra cost, data loss, damage to reputation…
Contingency reserve
A margin of time or budget set aside to absorb the identified risks of a project.
Control measure
Any arrangement that changes a risk: technical, organisational or human.
Corrective action
An action taken to remove the cause of an observed problem (incident, non-conformity) so that it does not happen again.

D

DPIA
Data protection impact assessment: an assessment required by the GDPR for processing likely to result in a high risk to people.

F

FMEA
Failure mode and effects analysis: a method that reviews each component or step to find how it can fail, with which effect and how critical it is.

G

Global prevention plan
In Belgium, the employer’s five-year plan setting prevention actions and priorities, broken down into annual action plans.
Gross risk
The level of a risk before the planned measures (also called inherent or initial risk).

H

HACCP
Hazard analysis and critical control points: a method to control food safety hazards.
Hazard
The property or ability of something (product, machine, situation) to cause harm.
HAZOP
Hazard and operability study: a systematic review of a process plant using guide words (more, less, no…).
Health and safety plan
On a construction site with several contractors: the document setting out the site’s risk analysis and prevention measures, prepared by the safety coordinator.
Hot work permit
Written authorisation given before hot work (welding, grinding, cutting), listing the fire precautions.

I

Impact
How large the consequences of a risk would be if it occurred, rated for example from 1 (negligible) to 5 (severe).
Incident
An unplanned event that caused or could have caused harm.
ISO 31000
The international standard giving general guidelines for risk management, applicable to any organisation.
ISO 45001
The international standard for occupational health and safety management systems.

K

Key risk indicator (KRI)
A measure that signals how a risk is evolving before it happens, such as the number of near misses or the accumulated delay.

L

Lessons learned
The practice of drawing lessons from an event or a project to improve future work.
LMRA
Last minute risk analysis: a short check by the team at the workplace, right before starting a task.
Lockout-tagout (LOTO)
The steps that make equipment safe before work on it: isolating energies, locking, tagging and checking.

M

Monte Carlo simulation
A technique that repeats a large number of random draws to estimate the possible spread of a duration or cost.
Musculoskeletal disorders (MSDs)
Disorders of muscles, tendons and nerves caused in particular by repetitive movements, postures and physical effort.

N

Near miss
An event that could have caused injury or damage but did not. Reporting it allows a fix before an accident happens.
NIS2
The European cybersecurity directive requiring essential and important entities to take risk management measures and report incidents.

O

Opportunity
An uncertain event whose effect on objectives would be positive. Some approaches manage threats and opportunities in the same register.

P

Permit to work
A document that authorises hazardous work once the safety conditions have been checked.
PPE
Personal protective equipment: helmet, gloves, glasses, harness, hearing protection… To be used when risks cannot be avoided in another way.
Preliminary hazard analysis
An analysis carried out early in a project to spot the main hazards and hazardous situations before the design is fixed.
Prevention adviser
In Belgium, the expert from the internal or external service who assists the employer with the well-being policy.
Preventive action
An action taken to stop a potential problem from happening. In a register, these are the measures that lower the probability of a risk.
Probability
The chance that a risk will occur over a given period, rated for example from 1 (rare) to 5 (almost certain).
Psychosocial risks
Risks to mental and physical health linked to work organisation, working relationships and working conditions.

R

Regulatory watch
Organised monitoring of changes in the rules that apply to an activity.
Residual risk
The level of a risk that remains once the treatment measures are in place.
Risk
The effect of uncertainty on objectives: a possible event that would have consequences if it happened.
Risk analysis
The work of identifying risks, understanding their causes and consequences, and estimating their level.
Risk appetite
The level and type of risk an organisation is willing to accept to reach its objectives.
Risk evaluation
The step that estimates the level of each risk (probability and impact) and compares it with the organisation’s criteria to set priorities.
Risk map
An overview of an organisation’s major risks, often on a probability × impact matrix, intended for senior management.
Risk matrix
A table crossing probability and impact to give each risk a level, for example on a 5×5 grid.
Risk owner
The person responsible for following a risk and carrying out its treatment.
Risk register
A structured list of the risks of a project or activity with causes, consequences, scores, owners and actions.
Risk review
A periodic meeting or check to update risks, their scores and the progress of actions.
Risk score
A measure of how important a risk is, usually probability multiplied by severity.
Risk tolerance
The acceptable variation around the risk appetite for a given objective or risk.
Risk transfer
A strategy that passes all or part of the financial consequences of a risk to a third party, such as an insurer or partner.
Risk treatment
Choosing and carrying out a strategy for a risk: avoid, reduce, transfer or accept.

S

Safety coordinator
The person appointed by the client to coordinate health and safety when several contractors work on a site.
Safety culture
The shared ways of thinking and acting about risk within an organisation.
Severity
How large the consequences of an event would be if it happened. Also called impact.
Seveso
European regulation covering sites that hold large quantities of dangerous substances.
Simultaneous operations
Several companies or teams working in the same place at the same time, with activities that can interfere.
Single risk assessment document
In France (DUERP), the document in which employers record and update the assessment of occupational risks.

T

Threat
A potential source of harm, often intentional (attacker, fraudster) in the security field.
Toolbox talk
A short team meeting about a concrete safety topic, often at the start of the day or week.

W

Workplace accident
An accident that happens through or in the course of work and causes an injury. It is reported and analysed so that it does not happen again.