Disclaimer
Last updated: November 28, 2026
A support tool, not advice
Risqure helps structure risk management. The risks, causes, consequences, scores and measures proposed by the application, the example registers, the public library, the guides and the articles are general information. They are not legal, technical, financial, medical or safety advice tailored to your situation.
Your responsibility
- The proposals are not exhaustive: risks specific to your project may be missing.
- Scores are typical values: they must be reviewed by people who know the field.
- Proposed measures must be chosen, sized and checked by a competent person (prevention advisor, health and safety coordinator, engineer, lawyer, data protection officer, etc.).
- Risqure does not replace the risk assessments, prevention plans, health and safety plans, studies or permits required by law, nor the opinion of prevention services, accredited bodies or authorities.
Editorial content
We write our guides and articles carefully and from recognised sources, but regulations change and differ between countries and regions. Always check the official texts in force before making a decision. If you spot an error, please report it to contact@risqure.com.
External links
The website may link to third-party sites. We do not control their content and are not responsible for it.
In case of discrepancy between language versions, the French version prevails.