Printable LMRA card (last minute risk analysis)

A free pocket card for last minute risk analysis: the questions to ask before starting, the stop situations and signatures.

✋ Last minute risk analysis

Before starting, I take two minutes to answer:

  1. Do I know exactly what I have to do, and do I have the work permit or instructions if needed?
  2. Am I trained and fit to do this task today?
  3. What can go wrong? (fall, crushing, cut, electricity, chemicals, fire, traffic, load…)
  4. Are the energies isolated and locked out where necessary?
  5. Are my equipment, tools and protections in good condition and suitable?
  6. Has the work area changed (other teams, weather, access, lighting)?
  7. Do I know what to do and who to call in an emergency?
⛔ I stop and warn my manager if:
  • I answer “no” or “I don’t know” to one of the questions;
  • the situation is different from what was planned;
  • a protection is missing or damaged.
Date and task
Names and signatures

Nobody is ever blamed for stopping work for safety reasons. — risqure.com

What is an LMRA?

An LMRA (last minute risk analysis) is a two-minute check that each worker does right before starting a task. It does not replace the risk assessment prepared beforehand: it checks that the real situation matches what was planned.

How to use the card

Print the card in pocket size or post it at the entrance of the work area. Before starting, the team answers the seven questions. A single “no” or “I don’t know” is enough to stop and warn the supervisor. The signatures keep a record of the check.

The right to stop work

An LMRA only works if everyone can stop the job without fear. Repeat it at every induction: nobody is ever blamed for stopping a task for safety reasons.

Frequently asked questions

What is the difference between an LMRA and a risk assessment?

The risk assessment is prepared in advance by management; the LMRA is done on the spot by the people doing the task, right before they start.

Is an LMRA required for VCA or SCC?

VCA/SCC recommends it and clients often require it on construction and industrial sites. Check the requirements of your client and your certification.

Should the LMRA be repeated for every task?

Yes, for each new task or as soon as conditions change: another team, weather, tool, area or a long interruption.

This information is general and does not replace advice adapted to your situation. Always check the official texts in force. Disclaimer