Risk register: template, columns and best practices
The risk register is the core document of risk management for a project or an activity. It lists every identified risk, its assessment, its owner and the agreed actions. Kept up to date, it is both a management tool for the team and evidence of control for a client, an insurer or an auditor.
What is a risk register for?
- Anticipate: list what could go wrong before it happens.
- Prioritise: with the risk matrix, focus effort on high and critical risks.
- Assign responsibility: each risk and each action has an owner and a due date.
- Demonstrate: meet the requirements of ISO 31000, ISO 45001, a safety plan or a tender.
The essential columns
| Column | Content |
|---|---|
| Reference | A unique ID (R-001, R-002…) so everyone talks about the same risk. |
| Risk title | An uncertain event, clearly worded: “Fall from height during roof work”. |
| Category | Safety, environment, financial, schedule, technical, legal, reputation… |
| Cause | What can trigger the event. |
| Consequence | What happens if it occurs. |
| Probability and impact | Rated 1 to 5; their product is the gross score. |
| Strategy | Reduce, transfer (insurance, contract), avoid or accept. |
| Actions | Prevention and protection measures, with owner, due date and progress. |
| Residual score | Expected level once the actions are done. |
| Owner and review date | Who follows the risk and when it will be re-assessed. |
| Status | Open, in treatment, under control, closed. |
Free template to download
Download our risk register template (CSV, opens in Excel), pre-filled with twelve real construction risks and their scores. You can then import it as is into Risqure.
How to build the register, step by step
- Describe the context: sector, location, team size, budget, deadlines, hazardous activities, stakeholders.
- Identify the risks with the team: lessons learned, standard lists by sector (see our risk register examples), site visit, interface analysis.
- Assess each risk on the 5×5 matrix, using the worst credible scenario.
- Decide on actions: at least one prevention barrier for each major cause and one protection barrier for each serious consequence.
- Assign an owner and a due date to each action.
- Monitor and review: monthly review of critical risks, update after every incident, close risks that no longer exist.
Spreadsheet or software?
A spreadsheet is enough to get started, but it soon shows its limits: multiple versions sent by e-mail, forgotten actions, no reminders, no history, a matrix redrawn by hand. A tool like Risqure keeps a single shared register, sends reminders, logs changes, shows the matrix and the exposure trend, and exports to PDF or Excel at any time. It is free.
Best practices
- Word risks as events, not as findings (“staff shortage” is a cause; “delay due to lack of qualified staff” is a risk).
- Aim for 20 to 40 risks per project: beyond that, nobody reads the register.
- Link incidents and near misses to risks: they show whether the scoring is realistic.
- Share the register with the subcontractors concerned, read-only if needed.
To go faster, describe your project in Risqure: the tool proposes the relevant risks, their score and the related measures. Examples: construction project, IT project, event.
Free, no credit card, ready in 10 minutes.