Risk register example: Wind farm

Developing and building wind turbines: permits and appeals, heavy lifting, remote sites and grid connection.

Adapt it to my project (free) Download for Excel (CSV)

Risks35
● Low0
● Moderate10
● High12
● Critical13

Assumptions: Energy / utilities · Planning / design · 50 people · work at height (roofs, scaffolding, platforms), lifting operations (cranes, hoists), electrical work or work near live installations, remote or hard-to-access site, mainly outdoors, works during winter, protected natural area or sensitive environment, permits or authorisations required, suppliers outside europe or long lead times, excavation, trenches, earthworks.

Ref.RiskScorePreventionProtection
R-001 Fall from height
Cause : Missing or removed guardrails, scaffold not inspected, harness misused
Consequence : Serious injury or death, investigation, site stoppage
25 P5×I5 • Collective protection before any access
• Scaffold handover and daily check
• Rescue-at-height plan
R-002 Heat stroke
Cause : Physical work in full sun, heatwave, insufficient hydration
Consequence : Serious illness, hospitalisation, death
25 P5×I5 • Shifted hours and shaded breaks
• Cool water and buddy checks
R-003 Dropped load or lifting equipment overturning
Cause : Incorrect slinging, misjudged load, wind, unstable ground
Consequence : Crushing, fatality, major damage
20 P4×I5 • Lifting plan for critical lifts
• Qualified operators and slingers, inspected gear
• No one under the load
R-004 Fall from a ladder or stepladder
Cause : Ladder used as a workstation, damaged equipment, poor footing
Consequence : Fractures, head injury
16 P4×I4 • Mobile platforms instead of ladders
• Visual check before use
R-005 Falling objects from height
Cause : Unsecured materials and tools, no exclusion zone below
Consequence : Serious injury to people below, material damage
16 P4×I4 • Toe boards, nets and tethered tools
• Marked exclusion zone below
R-006 Supply chain disruption by an external event
Cause : Conflict, natural disaster, port or logistics blockage at a supplier
Consequence : Production or site stoppage, delays, penalties
16 P4×I4 • Map tier-1 and tier-2 suppliers
• Safety stock for critical components
R-007 Accident during wind turbine work
Cause : Work at height and in confined spaces, difficult evacuation, weather
Consequence : Fall, casualty hard to rescue
15 P3×I5 • Specific training and working in pairs
• Rescue plan and evacuation equipment
R-008 Prolonged bad weather
Cause : Rain, frost, snow or strong wind during outdoor work
Consequence : Site stoppages, degraded quality (concrete, paint), delay
15 P5×I3 • Season-aware scheduling
• Temporary protection
R-009 Electric shock or electrocution
Cause : Work near live parts, incomplete isolation
Consequence : Severe burns, death, fire
15 P3×I5 • Electrical isolation and voltage check
• Up-to-date electrical authorisations
R-010 Arc flash during high-voltage switching
Cause : Unsuitable equipment, procedure not followed
Consequence : Severe burns, death
15 P3×I5 • Switching procedures and authorised person
• Arc flash protective equipment
R-011 Slip, trip or fall on the same level
Cause : Wet or cluttered floors, cables on the floor, poor lighting, level changes
Consequence : Sprains, fractures, sick leave
15 P5×I3 • Housekeeping and clear walkways
• Lighting and suitable footwear
R-012 Struck or crushed by a moving load
Cause : Suspended loads, pallets, doors or equipment moving near people
Consequence : Crushing, fractures, death
15 P3×I5 • Marked exclusion zones
• Audible and visual movement warnings
R-013 Team fatigue and overload
Cause : High workload over a long period, repeated overtime
Consequence : Absenteeism, mistakes, resignations, accidents
15 P5×I3 • Workload and hours monitoring
• Cover and rest plan
R-014 DC electric arc
Cause : Poorly crimped or incompatible connectors, work on energised strings in daylight
Consequence : Burns, fire on the installation
12 P3×I4 • Compatible connectors and checked crimping
• Workers trained for DC
R-015 Thermal runaway in battery storage
Cause : Cell defect, overcharging, failed ventilation or cooling
Consequence : Fire, explosion, toxic gases
12 P3×I4 • Battery management system and monitoring
• Safety distances and fire brigade plan
R-016 Unexpected start-up during maintenance
Cause : Residual energy, remote control, controller restarting
Consequence : Crushing, electric shock, entanglement
12 P3×I4 • Isolate all energy sources
• Lockout sheets per machine
R-017 Damage to a gas pipeline
Cause : Work nearby without precise location, inaccurate plans
Consequence : Leak, explosion, neighbourhood evacuation
12 P3×I4 • Request plans and hand-dig trial holes
• Emergency procedure for leaks
R-018 Lower profitability than forecast
Cause : Overestimated output, changes to feed-in prices or support schemes, underestimated operating costs
Consequence : Longer payback, difficulty repaying loans
12 P3×I4 • Profitability study with prudent scenarios
• Production monitoring and maintenance
R-019 Energy price volatility
Cause : Unstable markets, indexed contracts
Consequence : Uncertain profitability, budget variances
12 P3×I4 • Price scenarios in the business plan
• Hedging with fixed-price contracts
R-020 Permit granted late or refused
Cause : Incomplete application, underestimated processing times, third-party appeals
Consequence : Delayed start, idle teams, project to be redesigned
12 P4×I3 • Permit back-schedule
• Pre-application meeting with authorities
R-021 Payment fraud (fake supplier or fake CEO)
Cause : Message impersonating a supplier or management, bank detail change not verified
Consequence : Financial loss often unrecoverable
12 P3×I4 • Call-back for any bank detail change
• Dual approval of transfers
R-022 Higher customs duties or trade restrictions
Cause : Trade tensions, sanctions, new import or export barriers
Consequence : Extra costs, customs delays, closed markets
12 P4×I3 • Customs watch and product origin
• Alternative suppliers in other regions
R-023 Delayed delivery from abroad
Cause : Long transport, customs, international logistics disruptions
Consequence : Equipment unavailable on schedule, timeline shifted
12 P4×I3 • Early ordering and shipment tracking
• Local substitute solution
R-024 Adverse exchange rate movements
Cause : Purchases or sales in foreign currency, long delays between order and payment
Consequence : Reduced margin, unpredictable cost price
12 P3×I4 • Invoice in euros where possible
• Currency hedging for large amounts
R-025 Industrial dispute or strike
Cause : Tensions over pay or working conditions, insufficient social dialogue
Consequence : Work stoppage, delays, deteriorating climate
12 P4×I3 • Regular dialogue with staff representatives
• Continuity plan for industrial action
R-026 Appeal against a renewable energy project
Cause : Local opposition, contested landscape or biodiversity impact
Consequence : Project suspended or cancelled, years of delay
9 P3×I3 • Early consultation and robust impact studies
• Schedule including appeal periods
R-027 Local grid congestion
Cause : Insufficient injection or offtake capacity, long reinforcement times
Consequence : Project capped in power or postponed
9 P3×I3 • Early grid connection study
• Flexibility solutions
R-028 Working in the cold
Cause : Low temperatures, wind, humidity, cold stores
Consequence : Hypothermia, frostbite, muscle problems, falls on icy ground
9 P3×I3 • Suitable clothing and heated rooms
• Organise exposure time
R-029 Exposure to solar ultraviolet radiation
Cause : Long outdoor work in summer without protection
Consequence : Sunburn, long-term skin cancer
9 P3×I3 • Schedule work at less exposed times
• Covering clothing and sunscreen
R-030 Structure or roof unsuitable for the installation
Cause : Roof structure strength not checked, old or fragile roof covering
Consequence : Unexpected strengthening, leaks, risk of collapse
9 P3×I3 • Prior structural study
• Protect fragile areas during works
R-031 Extreme weather event
Cause : More frequent and intense storms, floods, heatwaves or droughts
Consequence : Damage to installations, business interruption, repair costs
8 P2×I4 • Climate vulnerability assessment of the site
• Weather alert and safety plan
R-032 Delayed grid connection
Cause : Grid operator lead times, insufficient capacity
Consequence : Commissioning postponed, lost revenue
8 P2×I4 • Early connection request
• Schedule aligned with connection date
R-033 Dust emissions beyond the site
Cause : Demolition, earthworks, storage of fine materials in dry, windy weather
Consequence : Nuisance to neighbours, complaints, health effects
6 P2×I3 • Damping down and covering stockpiles
• Stop dusty operations in high wind
R-034 Harm to a protected species or habitat
Cause : Works during nesting season, destruction of hedges or wetlands
Consequence : Site stoppage, penalties, compensation duties
6 P2×I3 • Prior ecological survey
• Schedule avoiding sensitive periods
R-035 Climate change impacts on the project
Cause : More frequent heatwaves, droughts and heavy rain
Consequence : Work stoppages, damage, design to revise
6 P2×I3 • Include climate scenarios in design
• Plan to adapt hours and works

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Wind farm”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples