Risk register example: Energy renovation and heat pumps

Insulation, heat pumps and controls: performance not achieved, refrigerants, grants and occupied buildings.

Adapt it to my project (free) Download for Excel (CSV)

Risks30
● Low0
● Moderate15
● High7
● Critical8

Assumptions: Energy / utilities · Execution / works · 5 people · electrical work or work near live installations, pressure systems, gas, steam, work at height (roofs, scaffolding, platforms), occupied site (staff, residents, patients nearby), new technology or method, critical item from a single supplier.

Ref.RiskScorePreventionProtection
R-001 Fall from height
Cause : Missing or removed guardrails, scaffold not inspected, harness misused
Consequence : Serious injury or death, investigation, site stoppage
20 P4×I5 • Collective protection before any access
• Scaffold handover and daily check
• Rescue-at-height plan
R-002 Fall from a ladder or stepladder
Cause : Ladder used as a workstation, damaged equipment, poor footing
Consequence : Fractures, head injury
16 P4×I4 • Mobile platforms instead of ladders
• Visual check before use
R-003 Falling objects from height
Cause : Unsecured materials and tools, no exclusion zone below
Consequence : Serious injury to people below, material damage
16 P4×I4 • Toe boards, nets and tethered tools
• Marked exclusion zone below
R-004 Accident during wind turbine work
Cause : Work at height and in confined spaces, difficult evacuation, weather
Consequence : Fall, casualty hard to rescue
15 P3×I5 • Specific training and working in pairs
• Rescue plan and evacuation equipment
R-005 Restart while lockout not properly removed
Cause : Incomplete lockout, poor communication between teams, restart pressure
Consequence : Equipment energised or moving with a worker exposed
15 P3×I5 • Lockout procedure with personal padlocks
• Check before restart
R-006 Electric shock or electrocution
Cause : Work near live parts, incomplete isolation
Consequence : Severe burns, death, fire
15 P3×I5 • Electrical isolation and voltage check
• Up-to-date electrical authorisations
R-007 Arc flash during high-voltage switching
Cause : Unsuitable equipment, procedure not followed
Consequence : Severe burns, death
15 P3×I5 • Switching procedures and authorised person
• Arc flash protective equipment
R-008 Slip, trip or fall on the same level
Cause : Wet or cluttered floors, cables on the floor, poor lighting, level changes
Consequence : Sprains, fractures, sick leave
15 P5×I3 • Housekeeping and clear walkways
• Lighting and suitable footwear
R-009 DC electric arc
Cause : Poorly crimped or incompatible connectors, work on energised strings in daylight
Consequence : Burns, fire on the installation
12 P3×I4 • Compatible connectors and checked crimping
• Workers trained for DC
R-010 Thermal runaway in battery storage
Cause : Cell defect, overcharging, failed ventilation or cooling
Consequence : Fire, explosion, toxic gases
12 P3×I4 • Battery management system and monitoring
• Safety distances and fire brigade plan
R-011 Unexpected start-up during maintenance
Cause : Residual energy, remote control, controller restarting
Consequence : Crushing, electric shock, entanglement
12 P3×I4 • Isolate all energy sources
• Lockout sheets per machine
R-012 Damage to a gas pipeline
Cause : Work nearby without precise location, inaccurate plans
Consequence : Leak, explosion, neighbourhood evacuation
12 P3×I4 • Request plans and hand-dig trial holes
• Emergency procedure for leaks
R-013 Burn from hot fluid or corrosive product
Cause : Opening a pressurised or hot circuit, splash, no PPE
Consequence : Serious burns, eye injury
12 P3×I4 • Drain, cool and depressurise before opening
• Face shield, gloves and safety shower
R-014 Supply disruption of a critical item
Cause : Single supplier, no qualified alternative
Consequence : Work or production stopped while waiting for delivery
12 P3×I4 • Qualify a second supplier
• Safety stock
R-015 Supply chain disruption by an external event
Cause : Conflict, natural disaster, port or logistics blockage at a supplier
Consequence : Production or site stoppage, delays, penalties
12 P3×I4 • Map tier-1 and tier-2 suppliers
• Safety stock for critical components
R-016 Underperforming heat pump or heating installation
Cause : Wrong sizing, incorrect settings, incompatible emitters
Consequence : Poor comfort, higher consumption than expected
9 P3×I3 • Heat-loss study and sizing
• Commissioning and first-season monitoring
R-017 Lower profitability than forecast
Cause : Overestimated output, changes to feed-in prices or support schemes, underestimated operating costs
Consequence : Longer payback, difficulty repaying loans
9 P3×I3 • Profitability study with prudent scenarios
• Production monitoring and maintenance
R-018 Energy price volatility
Cause : Unstable markets, indexed contracts
Consequence : Uncertain profitability, budget variances
9 P3×I3 • Price scenarios in the business plan
• Hedging with fixed-price contracts
R-019 Structure or roof unsuitable for the installation
Cause : Roof structure strength not checked, old or fragile roof covering
Consequence : Unexpected strengthening, leaks, risk of collapse
9 P3×I3 • Prior structural study
• Protect fragile areas during works
R-020 Higher customs duties or trade restrictions
Cause : Trade tensions, sanctions, new import or export barriers
Consequence : Extra costs, customs delays, closed markets
9 P3×I3 • Customs watch and product origin
• Alternative suppliers in other regions
R-021 Poor command of a new technology or method
Cause : Lack of experience, limited field feedback
Consequence : Defects, rework, unplanned learning time
9 P3×I3 • Pilot test or prototype
• Expert support
R-022 Nuisance and complaints from neighbours
Cause : Noise, dust, vibration, traffic and parking
Consequence : Complaints, imposed working-hour restrictions, delay
9 P3×I3 • Neighbour information and dedicated contact
• Dust control and suitable hours
R-023 Incomplete equipment history and drawings
Cause : Documentation not updated, maintenance software poorly filled in
Consequence : Slow diagnosis, poor decisions, repeated interventions
9 P3×I3 • Systematic work order close-out
• Update drawings after changes
R-024 Uncontrolled use of generative AI tools
Cause : Staff pasting confidential or personal data into public tools
Consequence : Information leak, GDPR non-compliance, loss of trade secrets
9 P3×I3 • AI acceptable-use policy
• Enterprise AI tool with contractual commitments
R-025 Unchecked error produced by an AI system
Cause : Inaccurate output presented as reliable, no review, data bias
Consequence : Wrong decision, customer harm, liability
9 P3×I3 • Human review of content and decisions
• Testing and quality metrics before deployment
R-026 Lack of in-house digital skills
Cause : Reliance on one person or a provider, insufficient training
Consequence : Stalled projects, poor use of tools, security risks
9 P3×I3 • Targeted training plan
• Documentation and support contract
R-027 Noise exceeding permitted limits
Cause : Noisy equipment, night work, no measurements
Consequence : Complaints, enforced stoppage, fines
9 P3×I3 • Quieter equipment and acoustic screens
• Noise measurements and adapted hours
R-028 Operating without an up-to-date environmental permit
Cause : Undeclared change of activity, operating conditions not met
Consequence : Formal notice, fine, suspension of activity
8 P2×I4 • Register of permit obligations
• Regulatory check before any modification
R-029 Delayed grid connection
Cause : Grid operator lead times, insufficient capacity
Consequence : Commissioning postponed, lost revenue
8 P2×I4 • Early connection request
• Schedule aligned with connection date
R-030 Non-compliance with the EU AI Act
Cause : High-risk AI system not identified, insufficient transparency, missing documentation
Consequence : Fines, system withdrawn, reputational damage
8 P2×I4 • Inventory and classification of AI uses
• User information and technical documentation

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Energy renovation and heat pumps”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples