Risk register example: Indoor concert or show
A concert in a hall: crowd management, rigging, pyrotechnics, evacuation and alcohol.
Adapt it to my project (free) Download for Excel (CSV)
Assumptions: Events · Planning / design · 40 people · large crowds (more than 1,000 people), site open to the public, temporary structures (stages, tents, stands), lifting operations (cranes, hoists), electrical work or work near live installations, alcohol served, night or shift work, noise or vibration.
| Ref. | Risk | Score | Prevention | Protection |
|---|---|---|---|---|
| R-001 | Crowd crush
Cause : Capacity exceeded, bottlenecks, insufficient or blocked exits Consequence : Crushing, many injured, criminal liability of the organiser |
15 P3×I5 | • Crowd management plan and counting |
• Clear emergency exits and trained stewards |
| R-002 | Accident involving occupants or the public
Cause : Work area poorly separated from occupied areas Consequence : Third-party injury, complaint, civil liability |
12 P3×I4 | • Solid fencing and controlled access • Schedule hazardous work when areas are empty |
|
| R-003 | Bad weather on the day
Cause : Outdoor event with no fallback option Consequence : Cancellation, refunds, lost revenue |
12 P3×I4 | • Covered fallback option • Cancellation insurance |
|
| R-004 | Lower attendance than forecast
Cause : Late promotion, competing events, pricing Consequence : Insufficient revenue, deficit |
12 P3×I4 | • Promotion plan and pre-sales |
• Flexible budget |
| R-005 | Psychosocial risks and burnout
Cause : Excessive workload, conflicts, lack of recognition, long hours Consequence : Burnout, absenteeism, resignations, errors |
12 P4×I3 | • Workload monitoring |
• Confidential counsellor and support |
| R-006 | Temporary structure collapse
Cause : Unchecked assembly, strong wind, overload Consequence : Injuries, event interrupted |
10 P2×I5 | • Inspection by an accredited body |
• Wind limit and evacuation procedure |
| R-007 | Inadequate first aid after an accident or collapse
Cause : First-aiders absent or untrained, no defibrillator, difficult access for emergency services Consequence : Worsened injuries, avoidable death |
10 P2×I5 | • Trained first-aiders on every shift • Defibrillator and access plan for emergency services |
|
| R-008 | Build-up delay before opening
Cause : Limited logistics access, late deliveries, poorly coordinated suppliers Consequence : Delayed opening, rushed and dangerous build-up |
9 P3×I3 | • Detailed build-up schedule and delivery slots |
• Safety check before opening |
| R-009 | Supplier no-show or late
Cause : Unconfirmed contracts, tight logistics on the day Consequence : Disrupted programme, dissatisfied audience |
9 P3×I3 | • Written confirmation and detailed run sheet |
• Identified backup suppliers |
| R-010 | Dealing with difficult customers, users or patients
Cause : Waiting, frustration, repeated conflict situations Consequence : Stress, verbal aggression, staff burnout |
9 P3×I3 | • Conflict-management training |
• Post-incident support and reporting |
| R-011 | Fatigue and reduced alertness from night work
Cause : Shifted hours, insufficient sleep, poor lighting Consequence : Mistakes, accidents, health problems |
9 P3×I3 | • Shift and break planning • Adequate lighting everywhere |
|
| R-012 | Exposure to noise or vibration
Cause : Noisy tools and machines, long exposure Consequence : Hearing loss, vascular disorders, nuisance to neighbours |
9 P3×I3 | • Quieter equipment and enclosures |
• Hearing protection and health checks |
| R-013 | Supporter disorder at a sports event
Cause : Rivalries, alcohol, counterfeit tickets, insufficient segregation Consequence : Violence, damage, sanctions |
8 P2×I4 | • Risk assessment with the police • Named ticketing and access control |
|
| R-014 | Security incident during a public event
Cause : Unexpected attendance, threat, weather, poor coordination Consequence : Injuries, panic, authority held responsible |
8 P2×I4 | • Safety meeting with police, fire and medical services |
• Command post and cancellation procedure |
| R-015 | Medical emergencies among the audience
Cause : Heat, dehydration, alcohol, drugs, dense crowds Consequence : Casualties, overwhelmed emergency services |
8 P2×I4 | • Free water points and shaded areas |
• Sized first-aid provision |
| R-016 | Poorly managed emergency evacuation
Cause : No instructions, inaudible alarm, untrained staff Consequence : Panic, injuries during evacuation |
8 P2×I4 | • Evacuation plan and drill |
• Safety PA system and assembly point |
| R-017 | Malicious act or intrusion
Cause : Insufficient access control, unchecked items Consequence : Theft, vandalism, assault, serious threat |
8 P2×I4 | • Access control and searches if needed |
• Liaison with the police |
| R-018 | Accident during build-up or tear-down
Cause : Very short timeframes, work at height, contractors working together, fatigue Consequence : Fall, crushing, late opening |
8 P2×I4 | • Build-up schedule and contractor coordination • Prevention plan with each contractor |
|
| R-019 | Media crisis after an incident
Cause : Accident, complaint or error made public, late or clumsy response Consequence : Loss of trust, lost customers, pressure from authorities |
8 P2×I4 | • Crisis communication procedure • Quick-reaction sheet and press contacts |
|
| R-020 | Structures blown over by high wind
Cause : Tents, banners, screens or sets not ballasted, no evacuation threshold Consequence : Injuries, damage, cancellation |
8 P2×I4 | • Ballast per instructions and check before opening |
• Wind thresholds and structure evacuation plan |
| R-021 | Power or sound failure during the event
Cause : Undersized generator, exposed cables, no redundancy Consequence : Show interrupted, crowd movement, dissatisfaction |
8 P2×I4 | • Power budget and checked installation |
• Backup generator and independent safety lighting |
| R-022 | Accident during a road race
Cause : Poorly secured course, vehicles on the route, heat Consequence : Injured runners and spectators |
8 P2×I4 | • Course closure and marshals |
• First-aid posts along the route |
| R-023 | Event permits refused or late
Cause : Incomplete safety file, late submission, negative opinion from fire services Consequence : Event reduced, postponed or cancelled |
8 P2×I4 | • Permit backward schedule • Early meeting with authorities |
|
| R-024 | Event cancellation
Cause : Authority ban, extreme weather, artist withdrawal, health crisis Consequence : Refunds, losses, damaged image |
8 P2×I4 | • Suitable cancellation insurance • Terms of sale providing for postponement |
|
| R-025 | Fall on stairs
Cause : Slippery or damaged steps, poor lighting, carrying loads Consequence : Sprains, fractures |
8 P2×I4 | • Anti-slip nosings and handrails • Hoists or trolleys for loads |
|
| R-026 | Poor participant experience
Cause : Queues, insufficient toilets, confusing information Consequence : Negative reviews, fewer participants next year |
6 P2×I3 | • Size services to attendance |
• Real-time information |
| R-027 | Child lost during the event
Cause : Dense crowd, no meeting point, insufficient information Consequence : Distress, search mobilising teams, risk to the child |
6 P2×I3 | • Wristbands with contact number and meeting point |
• Lost child procedure |
| R-028 | Copyright and broadcast permission breaches
Cause : Music played without declaration, unauthorised recordings Consequence : Increased fees, disputes |
6 P2×I3 | • Declarations to collecting societies • Written permissions from artists and speakers |
|
| R-029 | Online disinformation or smear campaign
Cause : Rumours, fake reviews, manipulated content spread on social media Consequence : Loss of trust, lower activity, media crisis |
6 P2×I3 | • Monitor online mentions • Ready messages and spokesperson |
|
| R-030 | Ticketing fraud or failure
Cause : Fake tickets, overloaded platform, fraudulent payments Consequence : Lost revenue, queues, public dissatisfaction |
6 P2×I3 | • Named or uniquely coded tickets |
• Fallback mode for access control |
| R-031 | Sustainability requirements not met
Cause : Customers, lenders or regulation demanding carbon or social data that is not available Consequence : Lost contracts, costlier financing, greenwashing accusations |
6 P2×I3 | • Collect key sustainability indicators • Verifiable environmental claims |
|
| R-032 | Stakeholder opposition or disengagement
Cause : Stakeholders not identified, late consultation, conflicting interests Consequence : Challenges, delays, abandonment |
6 P2×I3 | • Stakeholder map |
• Tailored communication plan |
| R-033 | Noise exceeding permitted limits
Cause : Noisy equipment, night work, no measurements Consequence : Complaints, enforced stoppage, fines |
6 P2×I3 | • Quieter equipment and acoustic screens |
• Noise measurements and adapted hours |
| R-034 | Hand-arm and whole-body vibration
Cause : Vibrating tools, machines on rough ground, long exposure Consequence : Vascular and joint disorders, low back pain |
6 P2×I3 | • Low-vibration tools and suspended seats • Limit exposure time |
|
| R-035 | Waste and site damage after the event
Cause : Poor sorting, trampling, waterlogged ground Consequence : Restoration costs, dispute with owner or municipality |
4 P2×I2 | • Waste plan and ground protection |
• Entry and exit inspection |
This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.