Risk register example: Facility management contract
Running buildings for a client: statutory inspections, subcontractors, lone workers and service levels.
Adapt it to my project (free) Download for Excel (CSV)
Assumptions: Maintenance / facilities · Operation · 25 people · occupied site (staff, residents, patients nearby), electrical work or work near live installations, work at height (roofs, scaffolding, platforms), lone work, subcontractors involved, several sites, service must be available 24/7, road travel or deliveries.
| Ref. | Risk | Score | Prevention | Protection |
|---|---|---|---|---|
| R-001 | Fall from height
Cause : Missing or removed guardrails, scaffold not inspected, harness misused Consequence : Serious injury or death, investigation, site stoppage |
15 P3×I5 | • Collective protection before any access • Scaffold handover and daily check |
• Rescue-at-height plan |
| R-002 | Risks for cleaning staff
Cause : Mixed products, early or late hours, lone work, repetitive movements Consequence : Poisoning, MSDs, assaults |
12 P3×I4 | • Ready-to-use products and no mixing • Ergonomic equipment and daytime cleaning |
|
| R-003 | Slip, trip or fall on the same level
Cause : Wet or cluttered floors, cables on the floor, poor lighting, level changes Consequence : Sprains, fractures, sick leave |
12 P4×I3 | • Housekeeping and clear walkways • Lighting and suitable footwear |
|
| R-004 | Fall from a ladder or stepladder
Cause : Ladder used as a workstation, damaged equipment, poor footing Consequence : Fractures, head injury |
12 P3×I4 | • Mobile platforms instead of ladders • Visual check before use |
|
| R-005 | Falling objects from height
Cause : Unsecured materials and tools, no exclusion zone below Consequence : Serious injury to people below, material damage |
12 P3×I4 | • Toe boards, nets and tethered tools |
• Marked exclusion zone below |
| R-006 | Accident involving occupants or the public
Cause : Work area poorly separated from occupied areas Consequence : Third-party injury, complaint, civil liability |
12 P3×I4 | • Solid fencing and controlled access • Schedule hazardous work when areas are empty |
|
| R-007 | Unanticipated ageing of installations
Cause : No multi-year replacement plan Consequence : Repeated failures, urgent unbudgeted investments |
12 P3×I4 | • Multi-year investment plan |
• Emergency budget |
| R-008 | Payment fraud (fake supplier or fake CEO)
Cause : Message impersonating a supplier or management, bank detail change not verified Consequence : Financial loss often unrecoverable |
12 P3×I4 | • Call-back for any bank detail change • Dual approval of transfers |
|
| R-009 | Accident involving a new or temporary worker
Cause : No safety induction, unfamiliar site and rules, pressure to produce Consequence : Accidents in the first weeks |
12 P4×I3 | • Systematic safety induction • Buddy system in the first weeks |
|
| R-010 | Dependency on an external deliverable
Cause : Waiting for a study, equipment or third-party decision Consequence : Critical path blocked, delay |
12 P4×I3 | • External dependency log |
• Prepared workaround |
| R-011 | Extended service outage
Cause : Hosting failure, failed update, no redundancy Consequence : Users blocked, financial losses, contractual penalties |
12 P3×I4 | • Monitoring and automatic alerts |
• Recovery plan and redundancy |
| R-012 | Exploitation of an unpatched vulnerability
Cause : Internet-facing software and devices not updated, incomplete asset inventory Consequence : Intrusion, data theft, service outage |
12 P3×I4 | • Inventory of exposed assets and priority patching • Regular vulnerability scanning |
|
| R-013 | Compromise through a supplier or third-party software
Cause : Provider with broad access, tampered software update, poorly assessed dependency Consequence : Intrusion via the supply chain, data leak, business interruption |
12 P3×I4 | • Security assessment of critical suppliers • Limited and logged supplier access |
|
| R-014 | Resources shared across several projects
Cause : Experts assigned to several projects, conflicting priorities Consequence : Cascading delays, overload |
12 P4×I3 | • Portfolio resource plan |
• Written availability commitment |
| R-015 | Ineffective meetings and excessive reporting
Cause : Meetings without agenda, multiple reports, less productive time Consequence : Demotivated team, delays |
12 P4×I3 | • Short meetings with agenda and decisions • Single dashboard |
|
| R-016 | Electric shock or electrocution
Cause : Work near live parts, incomplete isolation Consequence : Severe burns, death, fire |
10 P2×I5 | • Electrical isolation and voltage check • Up-to-date electrical authorisations |
|
| R-017 | Failure of a major customer
Cause : Customer in financial difficulty, revenue concentration, high outstanding balance Consequence : Unpaid invoices, lost revenue, cash strain |
10 P2×I5 | • Monitor key customers’ financial health |
• Credit insurance or payment guarantees |
| R-018 | Inadequate first aid after an accident or collapse
Cause : First-aiders absent or untrained, no defibrillator, difficult access for emergency services Consequence : Worsened injuries, avoidable death |
10 P2×I5 | • Trained first-aiders on every shift • Defibrillator and access plan for emergency services |
|
| R-019 | Internal fraud or embezzlement
Cause : Insufficient segregation of duties, rare accounting checks, shared bank access Consequence : Financial losses, misstated accounts, dispute and proceedings |
10 P2×I5 | • Segregation of duties for payments |
• Bank reconciliations and surprise checks |
| R-020 | Ransomware attack
Cause : Unpatched computers, backups reachable from the network, no segmentation Consequence : Systems down, data lost, ransom demanded |
10 P2×I5 | • Patching and endpoint protection |
• Tested offline backups |
| R-021 | Poorly defined maintenance contracts
Cause : Unclear scope, response times not set, no indicators Consequence : Faults left unresolved, disputes with the provider |
9 P3×I3 | • Specifications with service levels |
• Quarterly KPI review |
| R-022 | Nuisance and complaints from neighbours
Cause : Noise, dust, vibration, traffic and parking Consequence : Complaints, imposed working-hour restrictions, delay |
9 P3×I3 | • Neighbour information and dedicated contact • Dust control and suitable hours |
|
| R-023 | Incomplete equipment history and drawings
Cause : Documentation not updated, maintenance software poorly filled in Consequence : Slow diagnosis, poor decisions, repeated interventions |
9 P3×I3 | • Systematic work order close-out |
• Update drawings after changes |
| R-024 | Accident during work on a plant roof
Cause : Roof equipment without safe access, no guardrails Consequence : Fall from height |
8 P2×I4 | • Permanent safe access and walkways • Roof access permit |
|
| R-025 | Unexpected start-up during maintenance
Cause : Residual energy, remote control, controller restarting Consequence : Crushing, electric shock, entanglement |
8 P2×I4 | • Isolate all energy sources • Lockout sheets per machine |
|
| R-026 | Lift breakdown or accident
Cause : Insufficient maintenance, overdue statutory inspections Consequence : People trapped, car fall, accident |
8 P2×I4 | • Maintenance contract and periodic inspections |
• Emergency phone and rescue procedure |
| R-027 | Assault on a security guard
Cause : Lone interventions, night patrols, intrusions Consequence : Injuries, trauma |
8 P2×I4 | • Intervention rules and remote verification |
• Lone-worker alert device |
| R-028 | Backup power failure
Cause : Generator or UPS not tested, insufficient fuel Consequence : Vital equipment stops during a power cut |
8 P2×I4 | • Regular load tests |
• Fuel reserve and supply contract |
| R-029 | Missed statutory periodic inspections
Cause : Deadlines not tracked (lifts, electrical, fire, lifting) Consequence : Non-compliance, liability in case of accident, insurance refusal |
8 P2×I4 | • Statutory inspection calendar |
• Track closure of findings |
| R-030 | Legionnaires’ disease from water systems
Cause : Stagnant or lukewarm water in pipework, poorly maintained cooling towers Consequence : Cases of Legionnaires’ disease among occupants, operator liability |
8 P2×I4 | • Water system management plan |
• Procedure in case of positive results |
| R-031 | Fall on stairs
Cause : Slippery or damaged steps, poor lighting, carrying loads Consequence : Sprains, fractures |
8 P2×I4 | • Anti-slip nosings and handrails • Hoists or trolleys for loads |
|
| R-032 | Poorly prepared emergency evacuation
Cause : Blocked exits, inaudible alarm, no drills, people with reduced mobility forgotten Consequence : Casualties during a fire or leak |
8 P2×I4 | • Annual evacuation drill |
• Appointed evacuation wardens |
| R-033 | Noise exceeding permitted limits
Cause : Noisy equipment, night work, no measurements Consequence : Complaints, enforced stoppage, fines |
6 P2×I3 | • Quieter equipment and acoustic screens |
• Noise measurements and adapted hours |
| R-034 | Energy use and emissions above targets
Cause : Energy-intensive equipment, no monitoring, habits Consequence : Higher costs, climate targets missed |
6 P3×I2 | • Monthly consumption tracking • Energy efficiency plan |
|
| R-035 | Stakeholder opposition or disengagement
Cause : Stakeholders not identified, late consultation, conflicting interests Consequence : Challenges, delays, abandonment |
6 P2×I3 | • Stakeholder map |
• Tailored communication plan |
This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.