Risqure
Risqure › Risk register examples › Software or app development

Risk register example: Software or app development

Building an application: requirements, security, performance, delays and key people.

Adapt it to my project (free) Download for Excel (CSV)

Risks35
● Low0
● Moderate28
● High7
● Critical0

Assumptions: IT / digital project · Execution / works · 8 people · scope likely to change, personal data processed, cloud or saas services, new technology or method, tight or immovable deadline.

Ref.RiskScorePreventionProtection
R-001 GDPR non-compliance
Cause : Personal data processed without legal basis, record or information of data subjects
Consequence : Data protection authority fine, complaints
12 P3×I4 • Record of processing and impact assessment
• Data minimisation and retention periods
R-002 Security vulnerability in the application
Cause : No code review or security testing, outdated dependencies
Consequence : Intrusion, data leak, reputational damage
12 P3×I4 • Code review and automated scanning
• Penetration test before go-live
R-003 Exploitation of an unpatched vulnerability
Cause : Internet-facing software and devices not updated, incomplete asset inventory
Consequence : Intrusion, data theft, service outage
12 P3×I4 • Inventory of exposed assets and priority patching
• Regular vulnerability scanning
R-004 Compromise through a supplier or third-party software
Cause : Provider with broad access, tampered software update, poorly assessed dependency
Consequence : Intrusion via the supply chain, data leak, business interruption
12 P3×I4 • Security assessment of critical suppliers
• Limited and logged supplier access
R-005 Psychosocial risks and burnout
Cause : Excessive workload, conflicts, lack of recognition, long hours
Consequence : Burnout, absenteeism, resignations, errors
12 P4×I3 • Workload monitoring
• Confidential counsellor and support
R-006 Data breach
Cause : Application vulnerability, excessive access rights, misconfiguration
Consequence : Mandatory notification, loss of trust, fines, claims
10 P2×I5 • Least-privilege access management
• Breach notification procedure
R-007 Ransomware attack
Cause : Unpatched computers, backups reachable from the network, no segmentation
Consequence : Systems down, data lost, ransom demanded
10 P2×I5 • Patching and endpoint protection
• Tested offline backups
R-008 Account takeover without multi-factor authentication
Cause : Reused or stolen password, email and online tools protected by a single factor
Consequence : Impersonation, data access, fraud sent from a legitimate account
9 P3×I3 • Mandatory multi-factor authentication
• Alerts on unusual sign-ins
R-009 Underestimated development effort
Cause : Estimates without detailed breakdown, hidden complexity, optimism
Consequence : Schedule and budget overrun
9 P3×I3 • Breakdown estimates by several people
• Incremental delivery and prioritisation
R-010 Cloud subscription and hosting cost drift
Cause : Oversized resources, unused licences, price increases
Consequence : Operating budget overrun
9 P3×I3 • Monthly cost and licence review
• Budget alerts
R-011 Uncontrolled use of generative AI tools
Cause : Staff pasting confidential or personal data into public tools
Consequence : Information leak, GDPR non-compliance, loss of trade secrets
9 P3×I3 • AI acceptable-use policy
• Enterprise AI tool with contractual commitments
R-012 User resistance to change
Cause : Project seen as imposed, users not involved, late training
Consequence : Workarounds, low usage, project failure
9 P3×I3 • Key users involved from design
• Go-live support
R-013 Accumulated technical debt
Cause : Development shortcuts, no automated tests, missing documentation
Consequence : Slow changes, frequent bugs, high maintenance costs
9 P3×I3 • Automated tests and code review
• Time reserved for paying down debt
R-014 Scope creep
Cause : Requests added during the project without trade-offs
Consequence : Schedule and budget overrun, overloaded team
9 P3×I3 • Change approval board
• Visible out-of-scope list
R-015 Low user adoption
Cause : Users not involved, insufficient training
Consequence : Return to old tools, benefits not achieved
9 P3×I3 • Key users involved from design
• Training and go-live support
R-016 Risky go-live
Cause : Big-bang cutover, no rollback plan
Consequence : Service interruption, inconsistent data
9 P3×I3 • Cutover rehearsal
• Tested rollback plan
R-017 Excessive dependence on the vendor or integrator
Cause : Proprietary customisations, no documentation, skills not transferred
Consequence : Rising costs, inability to change supplier
9 P3×I3 • Exit clauses and documentation deliverables
• Internal skills build-up
R-018 Insufficient testing before go-live
Cause : Compressed acceptance phase, users unavailable, incomplete scenarios
Consequence : Defects in production, loss of user confidence
9 P3×I3 • Acceptance plan with business scenarios
• Go-live criteria
R-019 Late decisions by the client or management
Cause : Slow approval of choices, multiple contacts, postponed trade-offs
Consequence : Delay, wasted team time, rework
9 P3×I3 • Schedule of expected decisions
• Default decision rule
R-020 Loss or theft of a laptop or phone
Cause : Unencrypted devices, data stored locally, frequent travel
Consequence : Data leak, mandatory notification, lost work
9 P3×I3 • Encrypt portable devices
• Remote wipe and central backup
R-021 Data leak through human error
Cause : Wrong recipient, wrong attachment, overly open sharing link
Consequence : Data breach to notify, loss of trust
9 P3×I3 • Short, repeated awareness sessions
• Send delay and external-recipient warning
R-022 Unclear objectives and success criteria
Cause : Vision not shared, expected benefits not measurable
Consequence : Diverging expectations, project judged a failure despite delivery
9 P3×I3 • Project charter with measurable objectives
• Benefits review after delivery
R-023 Cloud service misconfiguration
Cause : Storage left public, overly broad rights, logging disabled
Consequence : Data exposed on the internet, large-scale leak
8 P2×I4 • Review of sharing and security settings
• Documented baseline configuration
R-024 Vulnerability in an exposed API
Cause : Weak authentication, missing access control, excessive data returned
Consequence : Data leak, fraud
8 P2×I4 • API security testing
• Logging and anomaly detection
R-025 Non-compliance with the EU AI Act
Cause : High-risk AI system not identified, insufficient transparency, missing documentation
Consequence : Fines, system withdrawn, reputational damage
8 P2×I4 • Inventory and classification of AI uses
• User information and technical documentation
R-026 No cyber incident response plan
Cause : Roles undefined, emergency contacts unknown, notification duties ignored
Consequence : Slow reaction, greater damage, penalties for late notification
8 P2×I4 • One-page response plan and emergency contacts
• Annual cyber crisis exercise
R-027 Malicious act by an employee or former employee
Cause : Access not removed on departure, excessive rights, labour dispute
Consequence : Data theft or destruction, sabotage
8 P2×I4 • Leaver procedure with same-day access removal
• Six-monthly access review
R-028 Dependence on a cloud provider
Cause : Contract without exit clause, data in a proprietary format
Consequence : Forced price increases, costly migration, data outside the EU
8 P2×I4 • Exit and data location clauses
• Regular data exports
R-029 Poor performance under load
Cause : No load testing, undersized architecture
Consequence : Slowness, outages at peak times
8 P2×I4 • Realistic load testing
• Monitoring and scalable capacity
R-030 Outage at a major digital provider
Cause : Incident at a host, software vendor or operator many services depend on
Consequence : Several tools down at once, business blocked
8 P2×I4 • Map critical digital dependencies
• Degraded operating mode
R-031 Unregulated data transfer outside the EU
Cause : Provider or sub-processor outside the EU, no safeguards
Consequence : GDPR non-compliance, need to change tools
6 P2×I3 • Check location and safeguards
• Prefer EU hosting
R-032 Data protection not built in by design
Cause : Excessive collection, no deletion, data subject rights not planned
Consequence : Costly redesign, non-compliance
6 P2×I3 • Data protection review at design
• Export and deletion features planned
R-033 Intellectual property infringement
Cause : Use of protected content without rights, no transfer of rights by contractors
Consequence : Dispute, product withdrawal, damages
6 P2×I3 • Assignment-of-rights clause in contracts
• Check licences used
R-034 Hacked or defaced website
Cause : Outdated content management system and plug-ins, weak passwords
Consequence : Hijacked site, malware served to visitors, removal from search results
6 P2×I3 • Automatic updates and fewer plug-ins
• Integrity monitoring and site backup
R-035 Unrequested additions by the team (gold plating)
Cause : Features or finishes beyond the need, perfectionism
Consequence : Time and cost overruns without added value
6 P2×I3 • Scope check at each delivery
• Clear definition of done

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Software or app development”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples