Risk register example: Vehicle fleet and deliveries
Running vehicles and deliveries: road accidents, fatigue, loading, fuel costs and customers.
Adapt it to my project (free) Download for Excel (CSV)
Assumptions: Logistics / transport · Operation · 30 people · road travel or deliveries, work on or near public roads, heavy or repetitive manual handling, night or shift work, works during winter, lone work, several sites.
| Ref. | Risk | Score | Prevention | Protection |
|---|---|---|---|---|
| R-001 | Road accident while travelling
Cause : Fatigue, tight deadlines, phone use while driving, weather Consequence : Injuries, employer liability, vehicle off the road |
16 P4×I4 | • Driving rules and trip planning • Vehicle maintenance and winter equipment |
|
| R-002 | Road accident involving a truck or van driver
Cause : Fatigue, tight schedules, phone use, poorly maintained vehicle Consequence : Injuries, deaths, third-party damage |
15 P3×I5 | • Scheduling that respects driving and rest times • Preventive fleet maintenance |
|
| R-003 | Worker struck by road traffic
Cause : Insufficient signage, driver speed, poor visibility Consequence : Serious injury or death, road user accident |
15 P3×I5 | • Compliant protected temporary signage • Traffic order and high-visibility clothing |
|
| R-004 | Prolonged bad weather
Cause : Rain, frost, snow or strong wind during outdoor work Consequence : Site stoppages, degraded quality (concrete, paint), delay |
15 P5×I3 | • Season-aware scheduling |
• Temporary protection |
| R-005 | Musculoskeletal disorders among order pickers
Cause : Repeated loads, high rates, picking at floor or high levels Consequence : Back pain, sick leave, turnover |
12 P4×I3 | • Slotting by weight and turnover • Handling aids |
|
| R-006 | Cargo theft at a parking area
Cause : Stops at unsecured parking, curtains slashed, high-value goods Consequence : Losses, delays, insurance disputes |
12 P3×I4 | • Plan stops at secure parking |
• Tracking and trailer alarms |
| R-007 | Slip, trip or fall on the same level
Cause : Wet or cluttered floors, cables on the floor, poor lighting, level changes Consequence : Sprains, fractures, sick leave |
12 P4×I3 | • Housekeeping and clear walkways • Lighting and suitable footwear |
|
| R-008 | Musculoskeletal disorders
Cause : Heavy loads, repetitive movements, awkward postures Consequence : Chronic pain, sick leave, unfitness for work |
12 P4×I3 | • Handling aids • Task rotation and handling training |
|
| R-009 | Repetitive hand and arm movements
Cause : High work rates, unsuitable tools, no rotation Consequence : Tendinitis, carpal tunnel syndrome, sick leave |
12 P4×I3 | • Ergonomic analysis of repetitive tasks • Job rotation |
|
| R-010 | Fall from a ladder or stepladder
Cause : Ladder used as a workstation, damaged equipment, poor footing Consequence : Fractures, head injury |
12 P3×I4 | • Mobile platforms instead of ladders • Visual check before use |
|
| R-011 | Forklift accident
Cause : Untrained drivers, cluttered aisles, excessive speed Consequence : Serious injury, damage to stock and racks |
12 P3×I4 | • Driving authorisation and training • Clear aisles and speed limits |
|
| R-012 | Rising fuel and energy costs
Cause : Price volatility, fuel-hungry fleet, contracts without indexation Consequence : Lower margins, uncompetitive transport prices |
12 P3×I4 | • Fuel indexation clause |
• Eco-driving and route optimisation |
| R-013 | Psychosocial risks and burnout
Cause : Excessive workload, conflicts, lack of recognition, long hours Consequence : Burnout, absenteeism, resignations, errors |
12 P4×I3 | • Workload monitoring |
• Confidential counsellor and support |
| R-014 | Pedestrian struck by a delivery vehicle on site
Cause : Pedestrian and vehicle areas not separated, reversing, blind spots Consequence : Serious or fatal injuries |
10 P2×I5 | • Physical separation of traffic • Traffic plan and driver instructions |
|
| R-015 | Internal fraud or embezzlement
Cause : Insufficient segregation of duties, rare accounting checks, shared bank access Consequence : Financial losses, misstated accounts, dispute and proceedings |
10 P2×I5 | • Segregation of duties for payments |
• Bank reconciliations and surprise checks |
| R-016 | Cuts from sharp tools or edges
Cause : Knives, cutters, sheet metal or glass handled without protection Consequence : Lacerations, tendon injuries |
9 P3×I3 | • Retractable-blade tools |
• Suitable cut-resistant gloves |
| R-017 | Customer delivery delays
Cause : Carrier capacity shortage, road disruption, activity peaks Consequence : Customer stock-outs, penalties |
9 P3×I3 | • Shared volume forecasts |
• Alternative carriers |
| R-018 | Peak activity without enough resources
Cause : Seasonality, promotions, untrained temporary staff, late hiring Consequence : Picking errors, accidents, delivery delays |
9 P3×I3 | • Workload forecast shared with customers • Induction and training of temporary staff |
|
| R-019 | Fatigue and reduced alertness from night work
Cause : Shifted hours, insufficient sleep, poor lighting Consequence : Mistakes, accidents, health problems |
9 P3×I3 | • Shift and break planning • Adequate lighting everywhere |
|
| R-020 | Raw material shortage
Cause : Tight markets, failing supplier Consequence : Reduced production, higher costs |
9 P3×I3 | • Dual sourcing of critical materials |
• Sized safety stock |
| R-021 | Resources shared across several projects
Cause : Experts assigned to several projects, conflicting priorities Consequence : Cascading delays, overload |
9 P3×I3 | • Portfolio resource plan |
• Written availability commitment |
| R-022 | Ineffective meetings and excessive reporting
Cause : Meetings without agenda, multiple reports, less productive time Consequence : Demotivated team, delays |
9 P3×I3 | • Short meetings with agenda and decisions • Single dashboard |
|
| R-023 | Driver assault or hijacking
Cause : High-value loads, predictable stops, known routes Consequence : Injuries, trauma, load lost |
8 P2×I4 | • Route confidentiality and security instructions |
• Panic button and assault procedure |
| R-024 | Racking collapse
Cause : Damaged racks, overloading, no inspection Consequence : Injuries, loss of goods |
8 P2×I4 | • Annual inspection and load signs |
• Upright protectors |
| R-025 | Fall or crushing at the loading dock
Cause : Truck driving off unexpectedly, unsecured dock, poor visibility Consequence : Forklift or person falling, crushing |
8 P2×I4 | • Wheel chocks or vehicle restraint at the dock • Dock signals and lighting |
|
| R-026 | Theft of goods or cargo
Cause : Weak access control, unsecured parking, internal complicity Consequence : Losses, customer disputes, higher insurance premiums |
8 P2×I4 | • Access control and CCTV |
• Goods-in-transit insurance |
| R-027 | Falling load from poor securing
Cause : Load not strapped, unstable pallets, sudden braking Consequence : Injury during unloading, road accident, damaged goods |
8 P2×I4 | • Load-securing rules and equipment |
• Open doors carefully when unloading |
| R-028 | Breach of driving and rest time rules
Cause : Overly tight scheduling, misused tachograph, commercial pressure Consequence : Fines, vehicle immobilised, fatigue accidents |
6 P2×I3 | • Regular tachograph data analysis • Planning with realistic margins |
|
| R-029 | Risks for pregnant or breastfeeding workers
Cause : Exposure to substances, strain or night work not adapted Consequence : Harm to mother or child, non-compliance |
6 P2×I3 | • Specific assessment once pregnancy is announced • List of at-risk jobs prepared in advance |
|
| R-030 | Assault on a lone or night worker
Cause : Working alone in the evening or at night, handling valuables, isolated areas Consequence : Injuries, trauma |
6 P2×I3 | • Lighting, access control and closing procedure |
• Lone-worker alarm device |
| R-031 | Picking and delivery errors
Cause : Mixed-up items, labelling, pressure on rates Consequence : Returns, rework costs, customer dissatisfaction |
6 P2×I3 | • Barcode scanning checks |
• Error analysis and team feedback |
| R-032 | Working in the cold
Cause : Low temperatures, wind, humidity, cold stores Consequence : Hypothermia, frostbite, muscle problems, falls on icy ground |
6 P2×I3 | • Suitable clothing and heated rooms • Organise exposure time |
|
| R-033 | Different practices from one site to another
Cause : No common standard, teams far apart Consequence : Uneven quality, errors in handovers between sites |
6 P3×I2 | • Common standard and site lead |
• Cross-site audits |
| R-034 | Harassment or discrimination at work
Cause : Inappropriate behaviour tolerated, no reporting procedure Consequence : Victims’ suffering, proceedings, resignations, reputational damage |
6 P2×I3 | • Clear rules and manager training |
• Confidential reporting channel |
| R-035 | Noise exceeding permitted limits
Cause : Noisy equipment, night work, no measurements Consequence : Complaints, enforced stoppage, fines |
6 P2×I3 | • Quieter equipment and acoustic screens |
• Noise measurements and adapted hours |
This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.
In Risqure, choose “Vehicle fleet and deliveries”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.