Risk register example: Restaurant opening

Opening a restaurant: food safety, kitchen accidents, licences, staffing and cash flow.

Adapt it to my project (free) Download for Excel (CSV)

Risks35
● Low0
● Moderate30
● High4
● Critical1

Assumptions: Hospitality / retail · Planning / design · 12 people · food service, alcohol served, site open to the public, hot work (welding, cutting, grinding), heavy or repetitive manual handling, online payments, permits or authorisations required, new or temporary team, night or shift work.

Ref.RiskScorePreventionProtection
R-001 Data breach
Cause : Application vulnerability, excessive access rights, misconfiguration
Consequence : Mandatory notification, loss of trust, fines, claims
15 P3×I5 • Least-privilege access management
• Breach notification procedure
R-002 Food poisoning from poor temperature control
Cause : Slow cooling, inadequate hot holding, cold chain break
Consequence : Sick customers, closure order, reputation
12 P3×I4 • Blast chiller and temperature records
• Up-to-date food safety plan
R-003 Accident involving occupants or the public
Cause : Work area poorly separated from occupied areas
Consequence : Third-party injury, complaint, civil liability
12 P3×I4 • Solid fencing and controlled access
• Schedule hazardous work when areas are empty
R-004 Customer allergic reaction
Cause : Poorly identified allergens, cross-contamination, wrong information from staff
Consequence : Severe allergic shock, liability of the establishment
10 P2×I5 • Up-to-date allergen sheets for each dish
• Allergy emergency procedure
R-005 Inadequate first aid after an accident or collapse
Cause : First-aiders absent or untrained, no defibrillator, difficult access for emergency services
Consequence : Worsened injuries, avoidable death
10 P2×I5 • Trained first-aiders on every shift
• Defibrillator and access plan for emergency services
R-006 Burns and cuts in the kitchen
Cause : High pace, poorly maintained knives, hot oil, slippery floors
Consequence : Staff injuries, sick leave
9 P3×I3 • Workstation organisation and suitable equipment
• First aid kit and training
R-007 Verbal or physical violence from shop customers
Cause : Shoplifting interrupted, waiting, refusal of sale, alcohol
Consequence : Injuries, stress, absenteeism
9 P3×I3 • No physical intervention rule
• Support and reporting after incidents
R-008 Alcohol-related incidents
Cause : Excessive drinking, no control
Consequence : Fights, accidents, organiser liability
9 P3×I3 • Responsible serving policy
• Security staff and first-aid post
R-009 Dealing with difficult customers, users or patients
Cause : Waiting, frustration, repeated conflict situations
Consequence : Stress, verbal aggression, staff burnout
9 P3×I3 • Conflict-management training
• Post-incident support and reporting
R-010 Slip, trip or fall
Cause : Slippery floors, obstacles, poor lighting
Consequence : Injuries to staff or customers
9 P3×I3 • Immediate cleaning and signage
• Anti-slip flooring and suitable shoes
R-011 Seasonal drop in customers
Cause : Seasonality, competition, economic climate
Consequence : Revenue too low to cover fixed costs
9 P3×I3 • Low-season offers and events
• Cash reserve
R-012 High turnover and seasonal staff shortage
Cause : Demanding conditions, split shifts, unattractive pay
Consequence : Poorer service, overload, closing some days
9 P3×I3 • Early hiring and seasonal staff retention
• Rotas known in advance
R-013 Bad online reviews and declining reputation
Cause : Negative customer experiences, no responses, fake reviews
Consequence : Fewer customers and lower revenue
9 P3×I3 • Collect feedback on site
• Fast, professional responses to reviews
R-014 Shrinkage and stock losses in store
Cause : External and internal theft, receiving errors, breakage
Consequence : Lower margin, inventory discrepancies
9 P3×I3 • Security tags, CCTV and receiving checks
• Cycle counts
R-015 Rising rent and occupancy costs
Cause : Lease review, indexation, energy charges
Consequence : Lower profitability
9 P3×I3 • Negotiate lease clauses
• Track rent-to-sales ratio
R-016 Listeria or Salmonella contamination
Cause : Contaminated raw materials, poor hygiene, broken cold chain
Consequence : Serious poisoning, recall, prosecution
8 P2×I4 • Sampling plan and testing
• Tested withdrawal and recall procedure
R-017 Food fraud at a supplier
Cause : Ingredient substitution, false origin, dubious certificates
Consequence : Non-compliant product, image crisis, prosecution
8 P2×I4 • Food fraud vulnerability assessment
• Supplier audits and authenticity tests
R-018 Poorly managed emergency evacuation
Cause : No instructions, inaudible alarm, untrained staff
Consequence : Panic, injuries during evacuation
8 P2×I4 • Evacuation plan and drill
• Safety PA system and assembly point
R-019 Malicious act or intrusion
Cause : Insufficient access control, unchecked items
Consequence : Theft, vandalism, assault, serious threat
8 P2×I4 • Access control and searches if needed
• Liaison with the police
R-020 Media crisis after an incident
Cause : Accident, complaint or error made public, late or clumsy response
Consequence : Loss of trust, lost customers, pressure from authorities
8 P2×I4 • Crisis communication procedure
• Quick-reaction sheet and press contacts
R-021 Fire in the kitchen or premises
Cause : Greasy hoods and ducts, fryers, electrical installations, cigarette ends
Consequence : Premises destroyed, guests evacuated, long closure
8 P2×I4 • Periodic cleaning of hoods and ducts
• Suitable extinguishers and evacuation drills
R-022 Fall in the cold room or storeroom
Cause : Wet or icy floor, high shelving, poor lighting
Consequence : Sprains, fractures
8 P2×I4 • Non-slip floors and storage at body height
• Stable step and lighting
R-023 Fall on stairs
Cause : Slippery or damaged steps, poor lighting, carrying loads
Consequence : Sprains, fractures
8 P2×I4 • Anti-slip nosings and handrails
• Hoists or trolleys for loads
R-024 Serving alcohol to a minor or intoxicated person
Cause : No age check, commercial pressure
Consequence : Penalties, closure, liability in case of accident
6 P2×I3 • Systematic ID checks when in doubt
• Right to refuse backed by management
R-025 Shortage of a flagship product
Cause : Single supplier, shortage, sharp price rise
Consequence : Dish or product withdrawn, disappointed customers
6 P2×I3 • Second listed supplier
• Flexible menu
R-026 Accessibility or fire safety non-compliance of the premises
Cause : Fit-out works without checking applicable rules
Consequence : Opening refused, formal notice, extra works
6 P2×I3 • Regulatory check before works
• Inspection before opening
R-027 Missing or wrong allergen information
Cause : Menu not updated, staff not informed
Consequence : Allergic reaction, penalty
6 P2×I3 • Up-to-date, accessible allergen table
• Front-of-house training
R-028 Till or card payment failure
Cause : Network outage, terminal failure, payment provider down
Consequence : Lost sales, queues
6 P2×I3 • Backup terminal and mobile connection
• Degraded sales procedure
R-029 Risks for pregnant or breastfeeding workers
Cause : Exposure to substances, strain or night work not adapted
Consequence : Harm to mother or child, non-compliance
6 P2×I3 • Specific assessment once pregnancy is announced
• List of at-risk jobs prepared in advance
R-030 Assault or robbery at the till
Cause : Cash in the till, late opening hours, staff alone
Consequence : Injuries, trauma, financial losses
6 P2×I3 • Limit cash and do not close alone
• Robbery instructions
R-031 Sustainability requirements not met
Cause : Customers, lenders or regulation demanding carbon or social data that is not available
Consequence : Lost contracts, costlier financing, greenwashing accusations
6 P2×I3 • Collect key sustainability indicators
• Verifiable environmental claims
R-032 Online disinformation or smear campaign
Cause : Rumours, fake reviews, manipulated content spread on social media
Consequence : Loss of trust, lower activity, media crisis
6 P2×I3 • Monitor online mentions
• Ready messages and spokesperson
R-033 Exposure to biological agents
Cause : Contact with sick people, waste, animals or contaminated water
Consequence : Infections, absences
6 P2×I3 • Hand hygiene and recommended vaccination
• Protective equipment and exposure procedure
R-034 Occupational skin disease
Cause : Repeated contact with water, detergents, cement or solvents
Consequence : Eczema, skin allergies, unfitness for work
6 P2×I3 • Substitute irritating products
• Suitable gloves and skin care
R-035 Stakeholder opposition or disengagement
Cause : Stakeholders not identified, late consultation, conflicting interests
Consequence : Challenges, delays, abandonment
6 P2×I3 • Stakeholder map
• Tailored communication plan

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Restaurant opening”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples