Risqure
Risqure › Risk register examples › Opening a care home

Risk register example: Opening a care home

Opening a residential care facility: staffing, approvals, resident safety, food and data.

Adapt it to my project (free) Download for Excel (CSV)

Risks35
● Low0
● Moderate20
● High14
● Critical1

Assumptions: Healthcare · Planning / design · 40 people · vulnerable people (patients, children, elderly), food service, personal data processed, new or temporary team, permits or authorisations required, night or shift work, heavy or repetitive manual handling.

Ref.RiskScorePreventionProtection
R-001 GDPR non-compliance
Cause : Personal data processed without legal basis, record or information of data subjects
Consequence : Data protection authority fine, complaints
15 P3×I5 • Record of processing and impact assessment
• Data minimisation and retention periods
R-002 Slip, trip or fall on the same level
Cause : Wet or cluttered floors, cables on the floor, poor lighting, level changes
Consequence : Sprains, fractures, sick leave
12 P4×I3 • Housekeeping and clear walkways
• Lighting and suitable footwear
R-003 Healthcare-associated infection
Cause : Poor hand hygiene, protocols not followed
Consequence : Patient complications, investigation
12 P3×I4 • Hand hygiene audits
• Case reporting and analysis
R-004 Shortage of care staff
Cause : Hiring difficulties, absenteeism
Consequence : Overload, lower quality and safety of care
12 P4×I3 • Internal relief pool
• Minimum safe staffing levels
R-005 Medication error
Cause : Unclear prescriptions, interruptions during preparation
Consequence : Serious adverse effect for the patient
12 P3×I4 • Double check for high-risk drugs
• Interruption-free preparation area
R-006 Patient fall
Cause : Reduced mobility, medication, cluttered environment, call bell out of reach
Consequence : Fracture, longer stay, complaint from the family
12 P3×I4 • Fall risk assessment on admission
• Review every fall
R-007 Cyberattack crippling care systems
Cause : Unpatched workstations, vulnerable connected medical devices, phishing
Consequence : Cancelled care, patient transfers, health data leak
12 P3×I4 • Network segmentation and updates
• Downtime care procedures
R-008 Burnout among care staff
Cause : Emotional load, shift work, chronic understaffing
Consequence : Absenteeism, resignations, lower quality of care
12 P4×I3 • Stable rotas and protected rest
• Debriefing spaces and psychological support
R-009 Diagnostic error or delay
Cause : Workload, tests not followed up, results not passed on, cognitive bias
Consequence : Wrong or late treatment, deterioration, complaint
12 P3×I4 • Systematic tracking of pending results
• Second opinion for complex cases
R-010 Delayed response to a life-threatening emergency
Cause : Late alert, incomplete crash cart, untrained staff
Consequence : Avoidable death or after-effects
10 P2×I5 • Regular emergency skills training
• Daily crash cart check
R-011 Heatwave effects on frail patients and residents
Cause : Rooms not cooled, poor hydration, reduced summer staffing
Consequence : Dehydration, hospital admissions, deaths
10 P2×I5 • Cooled rooms and heatwave plan
• Identify the most vulnerable
R-012 Food poisoning
Cause : Broken cold chain, poor hygiene, undeclared allergens
Consequence : Illness, complaints, health inspection
10 P2×I5 • Approved caterer and temperature checks
• Allergen information
R-013 Wrong-site or wrong-patient surgery
Cause : No checklist, site marking omitted, team change
Consequence : Operation on the wrong side or patient
10 P2×I5 • Surgical safety checklist
• Surgical site marking
R-014 Sepsis not recognised in time
Cause : Warning signs not monitored, no early warning score, late escalation
Consequence : Septic shock, avoidable death
10 P2×I5 • Early warning score and sepsis protocol
• Rapid response team
R-015 Hospital-acquired venous thrombosis
Cause : Risk assessment not done, prophylaxis missed, prolonged immobility
Consequence : Pulmonary embolism, death
10 P2×I5 • Thrombosis risk assessment on admission
• Early mobilisation
R-016 Pressure ulcers or malnutrition in residents
Cause : Reduced mobility, unsuitable meals, insufficient weight monitoring
Consequence : Complications, hospital admissions, complaints
9 P3×I3 • Risk assessment and repositioning
• Monthly weighing and adapted meals
R-017 Moving and handling people
Cause : Transfers of patients or residents without equipment, staff alone
Consequence : Low back pain, injuries to carer and patient
9 P3×I3 • Transfer aids
• Training in people-handling techniques
R-018 Violence against healthcare staff
Cause : Waiting, pain, behavioural disorders, alcohol or drug use
Consequence : Injuries, post-traumatic stress, absenteeism
9 P3×I3 • De-escalation training
• Emergency alarm and post-incident support
R-019 Account takeover without multi-factor authentication
Cause : Reused or stolen password, email and online tools protected by a single factor
Consequence : Impersonation, data access, fraud sent from a legitimate account
9 P3×I3 • Mandatory multi-factor authentication
• Alerts on unusual sign-ins
R-020 Loss or theft of a laptop or phone
Cause : Unencrypted devices, data stored locally, frequent travel
Consequence : Data leak, mandatory notification, lost work
9 P3×I3 • Encrypt portable devices
• Remote wipe and central backup
R-021 Data leak through human error
Cause : Wrong recipient, wrong attachment, overly open sharing link
Consequence : Data breach to notify, loss of trust
9 P3×I3 • Short, repeated awareness sessions
• Send delay and external-recipient warning
R-022 Uncontrolled use of generative AI tools
Cause : Staff pasting confidential or personal data into public tools
Consequence : Information leak, GDPR non-compliance, loss of trade secrets
9 P3×I3 • AI acceptable-use policy
• Enterprise AI tool with contractual commitments
R-023 Information lost during handovers
Cause : Unstructured verbal handover, interruptions, incomplete records
Consequence : Missed care, treatment errors
9 P3×I3 • Structured handover method
• Protected handover time
R-024 Medication reconciliation error at admission or discharge
Cause : Usual treatment unknown, conflicting prescriptions
Consequence : Treatment omitted or duplicated, adverse effects
9 P3×I3 • Systematic medication history
• Discharge letter with updated treatment
R-025 Shortage of essential medicines or devices
Cause : Manufacturer stock-out, higher demand, single supplier
Consequence : Treatments postponed or substituted, risk of error
9 P3×I3 • Shortage watch and safety stock
• Validated substitution protocols
R-026 Patient identification error
Cause : Same names, no wristband, unsystematic checks
Consequence : Care or treatment given to the wrong person
8 P2×I4 • Two identifiers at every step
• Identification wristband
R-027 Breach of health data confidentiality
Cause : Records consulted without need, visible screens, insecure exchanges
Consequence : Penalties, complaints, loss of patient trust
8 P2×I4 • Role-based access and audit trails
• Secure health messaging
R-028 Absconding or missing vulnerable patient
Cause : Cognitive impairment, unsupervised exits, unsecured doors
Consequence : Patient in danger, search, liability
8 P2×I4 • Secure exits and alert devices
• Immediate search procedure
R-029 Backup power failure
Cause : Generator or UPS not tested, insufficient fuel
Consequence : Vital equipment stops during a power cut
8 P2×I4 • Regular load tests
• Fuel reserve and supply contract
R-030 No cyber incident response plan
Cause : Roles undefined, emergency contacts unknown, notification duties ignored
Consequence : Slow reaction, greater damage, penalties for late notification
8 P2×I4 • One-page response plan and emergency contacts
• Annual cyber crisis exercise
R-031 Malicious act by an employee or former employee
Cause : Access not removed on departure, excessive rights, labour dispute
Consequence : Data theft or destruction, sabotage
8 P2×I4 • Leaver procedure with same-day access removal
• Six-monthly access review
R-032 Vulnerable people exposed to hazards
Cause : Patients, children or elderly people near the activity area
Consequence : Serious accident, complaint, facility closure
8 P2×I4 • Joint risk assessment with the facility
• On-site contact and alert procedure
R-033 Overexposure to ionising radiation
Cause : Repeated scans, unsuitable settings, insufficient staff protection
Consequence : Excessive dose for patients and staff
6 P2×I3 • Justify and optimise examinations
• Dosimetry and protective equipment
R-034 Exposure to biological agents
Cause : Contact with sick people, waste, animals or contaminated water
Consequence : Infections, absences
6 P2×I3 • Hand hygiene and recommended vaccination
• Protective equipment and exposure procedure
R-035 Risks for pregnant or breastfeeding workers
Cause : Exposure to substances, strain or night work not adapted
Consequence : Harm to mother or child, non-compliance
6 P2×I3 • Specific assessment once pregnancy is announced
• List of at-risk jobs prepared in advance

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Opening a care home”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples