Risqure
Risqure › Risk register examples › Electronic patient record

Risk register example: Electronic patient record

Deploying a patient record system: health data, availability, migration and adoption by care staff.

Adapt it to my project (free) Download for Excel (CSV)

Risks35
● Low0
● Moderate21
● High13
● Critical1

Assumptions: Healthcare · Planning / design · 8 people · personal data processed, service must be available 24/7, data migration, integration with existing systems, cloud or saas services.

Ref.RiskScorePreventionProtection
R-001 Exploitation of an unpatched vulnerability
Cause : Internet-facing software and devices not updated, incomplete asset inventory
Consequence : Intrusion, data theft, service outage
16 P4×I4 • Inventory of exposed assets and priority patching
• Regular vulnerability scanning
R-002 Compromise through a supplier or third-party software
Cause : Provider with broad access, tampered software update, poorly assessed dependency
Consequence : Intrusion via the supply chain, data leak, business interruption
12 P3×I4 • Security assessment of critical suppliers
• Limited and logged supplier access
R-003 GDPR non-compliance
Cause : Personal data processed without legal basis, record or information of data subjects
Consequence : Data protection authority fine, complaints
12 P3×I4 • Record of processing and impact assessment
• Data minimisation and retention periods
R-004 Extended service outage
Cause : Hosting failure, failed update, no redundancy
Consequence : Users blocked, financial losses, contractual penalties
12 P3×I4 • Monitoring and automatic alerts
• Recovery plan and redundancy
R-005 Healthcare-associated infection
Cause : Poor hand hygiene, protocols not followed
Consequence : Patient complications, investigation
12 P3×I4 • Hand hygiene audits
• Case reporting and analysis
R-006 Shortage of care staff
Cause : Hiring difficulties, absenteeism
Consequence : Overload, lower quality and safety of care
12 P4×I3 • Internal relief pool
• Minimum safe staffing levels
R-007 Medication error
Cause : Unclear prescriptions, interruptions during preparation
Consequence : Serious adverse effect for the patient
12 P3×I4 • Double check for high-risk drugs
• Interruption-free preparation area
R-008 Patient fall
Cause : Reduced mobility, medication, cluttered environment, call bell out of reach
Consequence : Fracture, longer stay, complaint from the family
12 P3×I4 • Fall risk assessment on admission
• Review every fall
R-009 Burnout among care staff
Cause : Emotional load, shift work, chronic understaffing
Consequence : Absenteeism, resignations, lower quality of care
12 P4×I3 • Stable rotas and protected rest
• Debriefing spaces and psychological support
R-010 Diagnostic error or delay
Cause : Workload, tests not followed up, results not passed on, cognitive bias
Consequence : Wrong or late treatment, deterioration, complaint
12 P3×I4 • Systematic tracking of pending results
• Second opinion for complex cases
R-011 Ransomware attack
Cause : Unpatched computers, backups reachable from the network, no segmentation
Consequence : Systems down, data lost, ransom demanded
10 P2×I5 • Patching and endpoint protection
• Tested offline backups
R-012 Wrong-site or wrong-patient surgery
Cause : No checklist, site marking omitted, team change
Consequence : Operation on the wrong side or patient
10 P2×I5 • Surgical safety checklist
• Surgical site marking
R-013 Sepsis not recognised in time
Cause : Warning signs not monitored, no early warning score, late escalation
Consequence : Septic shock, avoidable death
10 P2×I5 • Early warning score and sepsis protocol
• Rapid response team
R-014 Hospital-acquired venous thrombosis
Cause : Risk assessment not done, prophylaxis missed, prolonged immobility
Consequence : Pulmonary embolism, death
10 P2×I5 • Thrombosis risk assessment on admission
• Early mobilisation
R-015 Account takeover without multi-factor authentication
Cause : Reused or stolen password, email and online tools protected by a single factor
Consequence : Impersonation, data access, fraud sent from a legitimate account
9 P3×I3 • Mandatory multi-factor authentication
• Alerts on unusual sign-ins
R-016 Backups that cannot be restored
Cause : Backups never tested, incomplete or encrypted by the attacker
Consequence : Permanent data loss after an incident
9 P3×I3 • Quarterly restore test
• Offline or immutable copy
R-017 Incomplete or incorrect data migration
Cause : Inconsistent source data, poorly defined transformation rules
Consequence : Errors in production, loss of user trust
9 P3×I3 • Data cleansing and dry runs
• Reconciliation checks and rollback
R-018 Violence against healthcare staff
Cause : Waiting, pain, behavioural disorders, alcohol or drug use
Consequence : Injuries, post-traumatic stress, absenteeism
9 P3×I3 • De-escalation training
• Emergency alarm and post-incident support
R-019 Data leak through human error
Cause : Wrong recipient, wrong attachment, overly open sharing link
Consequence : Data breach to notify, loss of trust
9 P3×I3 • Short, repeated awareness sessions
• Send delay and external-recipient warning
R-020 Uncontrolled use of generative AI tools
Cause : Staff pasting confidential or personal data into public tools
Consequence : Information leak, GDPR non-compliance, loss of trade secrets
9 P3×I3 • AI acceptable-use policy
• Enterprise AI tool with contractual commitments
R-021 Lack of in-house digital skills
Cause : Reliance on one person or a provider, insufficient training
Consequence : Stalled projects, poor use of tools, security risks
9 P3×I3 • Targeted training plan
• Documentation and support contract
R-022 Blood exposure incident
Cause : Needlestick or cut with a contaminated item, full containers, recapping
Consequence : Infection risk, anxiety, medical follow-up
9 P3×I3 • Safety devices and containers within reach
• Displayed procedure
R-023 Information lost during handovers
Cause : Unstructured verbal handover, interruptions, incomplete records
Consequence : Missed care, treatment errors
9 P3×I3 • Structured handover method
• Protected handover time
R-024 Medication reconciliation error at admission or discharge
Cause : Usual treatment unknown, conflicting prescriptions
Consequence : Treatment omitted or duplicated, adverse effects
9 P3×I3 • Systematic medication history
• Discharge letter with updated treatment
R-025 Shortage of essential medicines or devices
Cause : Manufacturer stock-out, higher demand, single supplier
Consequence : Treatments postponed or substituted, risk of error
9 P3×I3 • Shortage watch and safety stock
• Validated substitution protocols
R-026 No cyber incident response plan
Cause : Roles undefined, emergency contacts unknown, notification duties ignored
Consequence : Slow reaction, greater damage, penalties for late notification
8 P2×I4 • One-page response plan and emergency contacts
• Annual cyber crisis exercise
R-027 Breach of health data confidentiality
Cause : Records consulted without need, visible screens, insecure exchanges
Consequence : Penalties, complaints, loss of patient trust
8 P2×I4 • Role-based access and audit trails
• Secure health messaging
R-028 Electronic health record unavailable
Cause : Outage, maintenance, cyberattack
Consequence : No access to history and treatments, delays and errors
8 P2×I4 • Downtime procedure and backup printouts
• Re-entry and checks after recovery
R-029 Cloud service misconfiguration
Cause : Storage left public, overly broad rights, logging disabled
Consequence : Data exposed on the internet, large-scale leak
8 P2×I4 • Review of sharing and security settings
• Documented baseline configuration
R-030 Outage at a major digital provider
Cause : Incident at a host, software vendor or operator many services depend on
Consequence : Several tools down at once, business blocked
8 P2×I4 • Map critical digital dependencies
• Degraded operating mode
R-031 Backup power failure
Cause : Generator or UPS not tested, insufficient fuel
Consequence : Vital equipment stops during a power cut
8 P2×I4 • Regular load tests
• Fuel reserve and supply contract
R-032 Malicious act by an employee or former employee
Cause : Access not removed on departure, excessive rights, labour dispute
Consequence : Data theft or destruction, sabotage
8 P2×I4 • Leaver procedure with same-day access removal
• Six-monthly access review
R-033 Non-compliance with the EU AI Act
Cause : High-risk AI system not identified, insufficient transparency, missing documentation
Consequence : Fines, system withdrawn, reputational damage
8 P2×I4 • Inventory and classification of AI uses
• User information and technical documentation
R-034 Failure to meet NIS2 obligations
Cause : Entity in scope not registered, missing risk-management measures, incidents not notified
Consequence : Fines, management liability, regulator inspection
8 P2×I4 • Scope check and registration
• Cybersecurity action plan tracked by management
R-035 Unregulated data transfer outside the EU
Cause : Provider or sub-processor outside the EU, no safeguards
Consequence : GDPR non-compliance, need to change tools
6 P2×I3 • Check location and safeguards
• Prefer EU hosting

This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.

Make it yours in 2 minutes

In Risqure, choose “Electronic patient record”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.

Create my register for free

Other examples in this sector

← All risk register examples