Risk register example: Business or start-up launch
Starting a company: funding, cash flow, customers, key people, legal and digital risks.
Adapt it to my project (free) Download for Excel (CSV)
Assumptions: Other · Initiation · 4 people · first project of this type for the team, new or temporary team, personal data processed, online payments, scope likely to change.
| Ref. | Risk | Score | Prevention | Protection |
|---|---|---|---|---|
| R-001 | Data breach
Cause : Application vulnerability, excessive access rights, misconfiguration Consequence : Mandatory notification, loss of trust, fines, claims |
15 P3×I5 | • Least-privilege access management |
• Breach notification procedure |
| R-002 | Difficulty recruiting qualified staff
Cause : Labour shortage, uncompetitive pay, long hiring times Consequence : Vacant positions, delays, team overload |
12 P4×I3 | • Anticipate skill needs |
• Partnerships and in-house training |
| R-003 | Late decisions by the client or management
Cause : Slow approval of choices, multiple contacts, postponed trade-offs Consequence : Delay, wasted team time, rework |
12 P4×I3 | • Schedule of expected decisions |
• Default decision rule |
| R-004 | Unclear objectives and success criteria
Cause : Vision not shared, expected benefits not measurable Consequence : Diverging expectations, project judged a failure despite delivery |
12 P4×I3 | • Project charter with measurable objectives |
• Benefits review after delivery |
| R-005 | Excessive dependence on the manager or owner
Cause : Decisions, customer relations and know-how concentrated in one person Consequence : Paralysis in case of absence, loss of company value |
12 P4×I3 | • Delegations and named deputy |
• Key person insurance |
| R-006 | Poor command of a new technology or method
Cause : Lack of experience, limited field feedback Consequence : Defects, rework, unplanned learning time |
12 P4×I3 | • Pilot test or prototype • Expert support |
|
| R-007 | GDPR non-compliance
Cause : Personal data processed without legal basis, record or information of data subjects Consequence : Data protection authority fine, complaints |
12 P3×I4 | • Record of processing and impact assessment • Data minimisation and retention periods |
|
| R-008 | Insufficient insurance cover
Cause : Cover not suited to the activity, limits too low, unknown exclusions Consequence : Uncompensated loss, costs borne by the organisation |
12 P3×I4 | • Annual insurance review |
• Project-specific insurance |
| R-009 | Difficult handover to operations
Cause : Incomplete documentation, late training of operations teams, open snags Consequence : Chaotic start-up, reliance on the project team after closure |
12 P4×I3 | • Handover plan prepared mid-project |
• Support period after go-live |
| R-010 | Risks not identified at the start
Cause : Risk analysis skipped or done as a formality, no lessons learned Consequence : Unbudgeted surprises, crises |
12 P3×I4 | • Risk identification workshop with the team |
• Regular risk register review |
| R-011 | Online payment fraud
Cause : Unsecured payments, no strong customer authentication Consequence : Financial losses, chargebacks, penalties |
12 P3×I4 | • Certified payment provider |
• Transaction monitoring |
| R-012 | Internal fraud or embezzlement
Cause : Insufficient segregation of duties, rare accounting checks, shared bank access Consequence : Financial losses, misstated accounts, dispute and proceedings |
12 P3×I4 | • Segregation of duties for payments |
• Bank reconciliations and surprise checks |
| R-013 | Scope creep
Cause : Requests added during the project without trade-offs Consequence : Schedule and budget overrun, overloaded team |
12 P4×I3 | • Change approval board |
• Visible out-of-scope list |
| R-014 | Accident involving a new or temporary worker
Cause : No safety induction, unfamiliar site and rules, pressure to produce Consequence : Accidents in the first weeks |
9 P3×I3 | • Systematic safety induction • Buddy system in the first weeks |
|
| R-015 | New or temporary team unfamiliar with the rules
Cause : Insufficient induction and training, turnover Consequence : Mistakes, accidents, procedures not followed |
9 P3×I3 | • Mandatory safety and job induction • Mentoring by an experienced colleague |
|
| R-016 | Account takeover without multi-factor authentication
Cause : Reused or stolen password, email and online tools protected by a single factor Consequence : Impersonation, data access, fraud sent from a legitimate account |
9 P3×I3 | • Mandatory multi-factor authentication |
• Alerts on unusual sign-ins |
| R-017 | Loss or theft of a laptop or phone
Cause : Unencrypted devices, data stored locally, frequent travel Consequence : Data leak, mandatory notification, lost work |
9 P3×I3 | • Encrypt portable devices |
• Remote wipe and central backup |
| R-018 | Data leak through human error
Cause : Wrong recipient, wrong attachment, overly open sharing link Consequence : Data breach to notify, loss of trust |
9 P3×I3 | • Short, repeated awareness sessions • Send delay and external-recipient warning |
|
| R-019 | Uncontrolled use of generative AI tools
Cause : Staff pasting confidential or personal data into public tools Consequence : Information leak, GDPR non-compliance, loss of trade secrets |
9 P3×I3 | • AI acceptable-use policy • Enterprise AI tool with contractual commitments |
|
| R-020 | Loss of knowledge and decision traceability
Cause : Decisions not written down, scattered documents, team turnover Consequence : Revisiting settled choices, disputes, errors |
9 P3×I3 | • Decision log • Single document space |
|
| R-021 | Regulatory change during the project
Cause : New standard, law or permit requirement adopted before completion Consequence : Studies and works to redo, extra costs, delay |
9 P3×I3 | • Project-specific regulatory watch |
• Change-in-law clause |
| R-022 | Unrequested additions by the team (gold plating)
Cause : Features or finishes beyond the need, perfectionism Consequence : Time and cost overruns without added value |
9 P3×I3 | • Scope check at each delivery • Clear definition of done |
|
| R-023 | No cyber incident response plan
Cause : Roles undefined, emergency contacts unknown, notification duties ignored Consequence : Slow reaction, greater damage, penalties for late notification |
8 P2×I4 | • One-page response plan and emergency contacts • Annual cyber crisis exercise |
|
| R-024 | Malicious act by an employee or former employee
Cause : Access not removed on departure, excessive rights, labour dispute Consequence : Data theft or destruction, sabotage |
8 P2×I4 | • Leaver procedure with same-day access removal • Six-monthly access review |
|
| R-025 | Cloud service misconfiguration
Cause : Storage left public, overly broad rights, logging disabled Consequence : Data exposed on the internet, large-scale leak |
8 P2×I4 | • Review of sharing and security settings • Documented baseline configuration |
|
| R-026 | Non-compliance with the EU AI Act
Cause : High-risk AI system not identified, insufficient transparency, missing documentation Consequence : Fines, system withdrawn, reputational damage |
8 P2×I4 | • Inventory and classification of AI uses • User information and technical documentation |
|
| R-027 | Exposure of young workers and interns
Cause : Lack of experience, dangerous tasks given without supervision Consequence : Serious accidents among young people |
6 P2×I3 | • List of forbidden or supervised tasks • Named mentor |
|
| R-028 | Project manager lacking experience
Cause : Project given to someone with little training, no coaching Consequence : Poor control of schedule, budget and risks |
6 P2×I3 | • Mentoring by an experienced project manager • Common method and templates |
|
| R-029 | Hacked or defaced website
Cause : Outdated content management system and plug-ins, weak passwords Consequence : Hijacked site, malware served to visitors, removal from search results |
6 P2×I3 | • Automatic updates and fewer plug-ins |
• Integrity monitoring and site backup |
| R-030 | Failure to meet whistleblowing obligations
Cause : No internal reporting channel although required Consequence : Penalties, direct external reports, loss of control |
6 P2×I3 | • Compliant reporting channel • Inform staff |
|
| R-031 | Unregulated data transfer outside the EU
Cause : Provider or sub-processor outside the EU, no safeguards Consequence : GDPR non-compliance, need to change tools |
6 P2×I3 | • Check location and safeguards • Prefer EU hosting |
|
| R-032 | Prolonged sitting and screen work
Cause : Poorly adjusted workstations, few breaks, full days at a screen Consequence : Back and neck pain, eye strain |
6 P3×I2 | • Ergonomic workstation set-up • Active breaks and task variation |
This example is indicative. Scores and measures must be adapted to your situation and checked by a competent person (prevention advisor, safety coordinator, data protection officer…). It does not replace the risk assessments required by law.
In Risqure, choose “Business or start-up launch”, adjust a few answers and get this register with owners, due dates, reminders and exports. Free.